Author: Ao, H.
Paper Title Page
MOPP090 Adjustment of the Coupling Factor of the Input Coupler of the ACS Linac by a Capacitive Iris in J-PARC 264
 
  • J. Tamura, H. Ao, K. Hirano, Y. Nemoto, N. Ouchi
    JAEA/J-PARC, Tokai-mura, Japan
  • H. Asano
    Nippon Advanced Technology Co. Ltd., Ibaraki-prefecture, Japan
  • F. Naito, K. Takata
    KEK, Ibaraki, Japan
 
  Annular-ring Coupled Structure (ACS) cavities have been installed to increase the beam energy of the Japan Proton Accelerator Research Complex (J-PARC) linac from 181 to 400 MeV in the maintenance period of 2013. Some of the pillbox type input couplers with a ceramic window to the ACS cavity have a larger coupling factor than the target value by an avoidable manufacturing error. To adjust the coupling factor, a capacitive iris was introduced in the rectangular waveguide near the coupler. As a result, it has been confirmed that the iris decreases the coupling factor to a target value without any significant increase in temperature and in a discharge rate during high-power operation. In this paper, the design procedure of the capacitive iris and the result of the coupling factor adjustment are presented.  
 
TUPP073 Study of the ACS Cavity Without a Bridge Cavity 596
TUPOL05   use link to see paper's listing under its alternate paper code  
 
  • F. Naito, K. Takata
    KEK, Ibaraki, Japan
  • H. Ao, K. Hasegawa, K. Hirano, T. Morishita, N. Ouchi
    JAEA/J-PARC, Tokai-mura, Japan
 
  J-PARC has installed the Annular-ring Coupled Structure (ACS) linac to increase the beam energy up to 400 MeV. One ACS module is composed of two accelerating tanks which are coupled by the bridge cavity. The bridge cavity simplifies the handling of the multi-tank system. While it is possible to feed the RF power into the each tanks directly with the power divider and the phase shifter instead of the bridge cavity. The rf properties of the ACS linac with the direct rf-power supply system has been measured by using the low power model made of aluminum. The measured results are described in the paper.  
slides icon Slides TUPP073 [5.042 MB]  
 
THPP089 High Power Conditioning of Annular-Ring Coupled Structures for the J-PARC Linac 1053
THPOL07   use link to see paper's listing under its alternate paper code  
 
  • H. Ao, T. Ito, Y. Nemoto, H. Oguri, N. Ouchi, J. Tamura
    JAEA/J-PARC, Tokai-mura, Japan
  • H. Asano
    Nippon Advanced Technology Co. Ltd., Ibaraki-prefecture, Japan
  • Z. Fang, K. Futatsukawa, K. Nanmo, T. Sugimura
    KEK, Ibaraki, Japan
 
  The linac of Japan Proton Accelerator Research Complex (J-PARC), which is an injector to a 3-GeV synchrotron, comprised a 3-MeV RFQ, 50-MeV DTLs and 181-MeV Separated-type DTLs. From September 2013, 25 annular-ring coupled structure (ACS) cavities were additionally installed to increase the linac beam energy up to 400 MeV and achieve 1-MW beam power of the 3-GeV synchrotron. After installation work the high power conditioning was started from December 2013 and most of the ACS cavities were conditioned within three weeks. We passed through some troubles and finally finished conditioning all the cavities until the middle of January 2014. In this paper, we present the conditioning results and how to handle the issue in the conditioning process.  
slides icon Slides THPP089 [7.756 MB]