SUPB013 The Beam Commissioning Plan of Injector II in C-ADS 32
 
  • Z.J. Wang, Y. He, H. Jia, C. Li, S.H. Liu, W. Wu, X.B. Xu, B. Zhang, H.W. Zhao
    IMP, Lanzhou, People's Republic of China
 
  The design work of the Injector II, which is 10 MeV proton linac, in C-ADS project is being finished and some key elements are being fabricated. Now it is necessary to definite the operation mode of beam commissioning, including the selection of the beam current, pulse length and repetition frequency. Also the beam commissions plan should be specified. The beam commissions procedures is simulated with t-mode code GPT. In this paper, the general beam commissioning plan of Injector II in CIADS and simulation results of commissions procedures are presented.  
 
MOPB088 Fabrication Tests for IMP 162.5 MHz RFQ 381
 
  • B. Zhang
    IMP, Lanzhou, People's Republic of China
 
  The RFQ for one of front ends of C-ADS is designed. The frequency of the RFQ is 162.5 MHz and the energy is 2.1 MeV. The beam intensity is 15 mA and it works at CW mode. Because of low frequency, the four-wing structure is big size. It makes fabrication will take more risks. Therefore, four fabrication testing were planned and done to minimize the technic risks. The description about fabrication and testing results are presented in the paper.  
 
TUPB039 Conceptual Design of Superconducting Heavy Ion Linear Injector for HIAF 561
 
  • Z.J. Wang, Y. He, H. Jia, C. Li, S.H. Liu, W. Wu, X.B. Xu, B. Zhang, H.W. Zhao
    IMP, Lanzhou, People's Republic of China
 
  A heavy ion accelerator facility, High Intensity Heavy Ion Accelerator Facility (HIAF), has been promoted by Institute of Modern Physics (IMP)of Chinese Academy of Sciences (CAS). The injector of the accelerator facility is a superconducting linac. It is a high intensity heavy ion linac and works on pulse mode. The final energy is 150 MeV/u. The accelerated species are from P to Uranium. The linac works with both laser and ECR ion source. The designed current is 20 emA. The general concept of HIAF and the preliminary design of linear injector are presented in the paper.  
 
TUPB055 R&D of IMP Superconducting HWR for China ADS 600
 
  • W.M. Yue, X.L. Guo, S. He, Y. He, R.X. Wang, P.R. Xiong, M.X. Xu, B. Zhang, C. Zhang, S.H. Zhang, S.X. Zhang, H.W. Zhao
    IMP, Lanzhou, People's Republic of China
 
  The R&D program of IMP superconducting HWR is based on the China ADS, The aim is to build and test a HWR prototype on December 2012. We have designed a 162.5 MHz β=0.09 half-wave resonator (HWR), and a copper HWR has been fabricated in January 2012. The fabrication of a Nb HWR will be completed by September 2012, and the fabrication of a slow tuner and a high power coupler for this HWR will be completed then. In this poster, we present the HWR electromagnetic design, mechanical design, fabrication arts, copper HWR RF test result, the design of the slow tuner and the power coupler.  
 
THPB026 The Beam Commissioning Plan of Injector II in C-ADS 906
 
  • Z.J. Wang, Y. He, H. Jia, C. Li, S.H. Liu, W. Wu, X.B. Xu, B. Zhang, H.W. Zhao
    IMP, Lanzhou, People's Republic of China
 
  The design work of the Injector II, which is 10 MeV proton linac, in C-ADS project is being finished and some key elements are being fabricated. Now it is necessary to definite the operation mode of beam commissioning, including the selection of the beam current, pulse length and repetition frequency. Also the beam commissions plan should be specified. The beam commissions procedures is simulated with t-mode code GPT. In this paper, the general beam commissioning plan of Injector II in CIADS and simulation results of commissions procedures are presented.  
 
THPB027 Progress of one of 10 MeV superconducting proton linear Injectors for C-ADS 909
 
  • Y. He, J. Meng, A. Shi, Z.J. Wang, J.X. Wu, W. Wu, H.S. Xu, Z. Xu, B. Zhang, J.H. Zhang, S.H. Zhang, Z.M. Zhang, H.W. Zhao, Z.Z. Zhou
    IMP, Lanzhou, People's Republic of China
  • D. Li
    LBNL, Berkeley, California, USA
 
  A 10 MeV superconducting proton linac is being design and constructing at Institute of Modern Physics (IMP) of Chinese Academy of Sciences (CAS). This proton linac is one of two injectors for Chinese ADS project. It is to validate one of concepts for C-ADS front end, to demonstrate the low beta acceleration, to minimize the risk of key technoledges within the Reference Design. It consists of a 2.1 MeV RFQ and two cryomodules hosting 8 HWR cavities. The basic frequecy is 162.5 MHz. The physical design of linac and the progess of prototypes for solid state amplifiers, superconducting solenoids, supercondecting HWRs, ion source, and RFQ are presented in the paper.  
 
THPB039 Design of a Four-Vane RFQ for China ADS Project 942
 
  • Z.L. Zhang, X. Du, Y. He, X. Jin, C. Li, Y. Liu, A. Shi, L.P. Sun, B. Zhang, H.W. Zhao
    IMP, Lanzhou, People's Republic of China
  • M.D. Hoff, A.R. Lambert, D. Li, J.W. Staples, S.P. Virostek
    LBNL, Berkeley, California, USA
  • J. Wang
    Lanzhou University of Technology, People's Republic of China
  • C. Zhang
    IAP, Frankfurt am Main, Germany
 
  A four-vane RFQ accelerator has been designed for the ADS project which has been launched in China since 2011. As one of the front ends of C-ADS LINAC, the RFQ works at a frequency of 162.5 MHz, accelerating the proton beam from 35 keV to 2.1 MeV. Due to the CW (continuous wave) operating mode, a small Kilpatric factor of 1.2 was adopted. At the same time, Pi-mode rods are employed to reduce the effect of dipole mode on quadrupole mode, and cavity tuning will be implemented by temperature adjustment of cooling water. Beam dynamics design, RF cavity design, thermal and stress analysis all will be presented in the paper.