Author: Xu, Y.
Paper Title Page
TUPB060 Multipacting Suppression Modeling for Half Wave Resonator and RF Coupler* 612
 
  • Z. Zheng, A. Facco, Z. Liu, J. Popielarski, K. Saito, J. Wei, Y. Xu, Y. Zhang
    FRIB, East Lansing, Michigan, USA
  • Z. Zheng
    TUB, Beijing, People's Republic of China
 
  Funding: Work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE-SC0000661
In prototype cryomodule test of Facility of Rare Isotope Beam (FRIB) β=0.53 half-wave-resonators (HWRs) severe multipacting barriers, prevented RF measurement at the full field specified. The multipacting could not be removed by several hours of RF conditioning. To better understand and to eliminate multipacting, physics models and CST simulations have been developed for both cavity and RF coupler. The simulations have good agreement with the multipacting discovered in coupler and cavity testing. Proposed cavity and coupler geometric optimizations are discussed in this paper.
 
 
TUPB040 Status of the Linac SRF Acquisition for FRIB 564
 
  • M. Leitner, E.C. Bernard, J. Binkowski, B. Bird, S. Bricker, S. Chouhan, C. Compton, K. Elliott, B. Enkhbat, A.D. Fox, L.L. Harle, M. Hodek, M.J. Johnson, I.M. Malloch, D. R. Miller, S.J. Miller, T. Nellis, D. Norton, R. Oweiss, J.P. Ozelis, J. Popielarski, L. Popielarski, K. Saito, M. Shuptar, G.J. Velianoff, J. Wei, M. Williams, K. Witgen, Y. Xu, Y. Yamazaki, Y. Zhang
    FRIB, East Lansing, USA
  • A. Facco
    INFN/LNL, Legnaro (PD), Italy
 
  Funding: This material is based upon work supported by the U.S. Department of Energy Office of Science under Cooperative Agreement DE SC0000661.
The Facility for Rare Isotope Beams (FRIB) will utilize a high-intensity, superconducting heavy-ion driver linac to provide stable ion beams from protons to uranium up to energies of >200 MeV/u and at a beam power of up to 400 kW. The ions are accelerated to about 0.5 MeV/u using a room-temperature 80.5 MHz RFQ and injected into a superconducting cw linac consisting of 330 individual low-beta cavities in 49 cryomodules operating at 2 K. This paper discusses the current status of the linac SRF acquisition strategy as the project phases into construction mode.