Author: Tiede, R.
Paper Title Page
THPLB03 Front-End Linac Design and Beam Dynamics Simulations for MYRRHA 813
 
  • C. Zhang, H. Klein, D. Mäder, H. Podlech, U. Ratzinger, A. Schempp, R. Tiede, M. Vossberg
    IAP, Frankfurt am Main, Germany
 
  Funding: Funded by the European Atomic Energy Community’s (Euratom) 7th Framework Programme under Grant Agreement n°269565.
A 17MeV, 176MHz, and CW (Continuous Wave) proton linac is being developed as the front end of the driver accelerator for the MYRRHA facility in Mol, Belgium. Based on the promising preliminary design, further simulation and optimization studies have been performed with respect to code benchmarking, RFQ simulation using realistic LEBT output distributions, and an updated CH-DTL design with more detailed inter-tank configurations. This paper summarizes the new results.
 
slides icon Slides THPLB03 [1.292 MB]  
 
THPB005 Front-End Linac Design and Beam Dynamics Simulations for MYRRHA 849
 
  • C. Zhang, H. Klein, D. Mäder, H. Podlech, U. Ratzinger, A. Schempp, R. Tiede, M. Vossberg
    IAP, Frankfurt am Main, Germany
 
  Funding: Funded by the European Atomic Energy Community’s (Euratom) 7th Framework Programme under Grant Agreement n°269565.
A 17MeV, 176MHz, and CW (Continuous Wave) proton linac is being developed as the front end of the driver accelerator for the MYRRHA facility in Mol, Belgium. Based on the promising preliminary design, further simulation and optimization studies have been performed with respect to code benchmarking, RFQ simulation using realistic LEBT output distributions, and an updated CH-DTL design with more detailed inter-tank configurations. This paper summarizes the new results.
 
 
THPB034 Status of the FAIR 70 MeV Proton Linac 927
 
  • L. Groening, W.A. Barth, R. Berezov, G. Clemente, P. Forck, R. Hollinger, A. Krämer, C. Mühle, J. Pfister, G. Schreiber, J. Trüller, W. Vinzenz, C. Will
    GSI, Darmstadt, Germany
  • N. Chauvin, O. Delferrière, O. Tuske
    CEA/IRFU, Gif-sur-Yvette, France
  • B. Koubek, H. Podlech, U. Ratzinger, A. Schempp, R. Tiede
    IAP, Frankfurt am Main, Germany
  • B. Launé, J. Lesrel
    IPN, Orsay, France
  • C.S. Simon
    CEA/DSM/IRFU, France
 
  To provide the primary proton beam for the FAIR anti-proton research program, a 70 MeV, 70 mA linac is currently under design & construction at GSI. The nc machine comprises an ECR source, a 3 MeV RFQ, and a DTL based on CH-cavities. Up to 36 MeV pairs of rf-coupled cavities (CCH) are used. A prototype cavity has been built and is prepared for high power rf-testing. An overview of the status as well as on the perspectives of the project is given.