Author: Simon, C.S.
Paper Title Page
THPLB09 Status of E-XFEL String and Cryomodule Assembly at CEA-Saclay 831
 
  • C. Madec
    CEA, Gif-sur-Yvette, France
  • S. Berry, J.-P. Charrier, A. Daël, M. Fontaine, Y. Gasser, O. Napoly, Y. Sauce, C.S. Simon, T.V. Vacher, B. Visentin
    CEA/DSM/IRFU, France
  • A. Brasseur, P. Charon, C. Cloué, S. Langlois, G. Monnereau, J.L. Perrin, D. Roudier, N. Sacépé
    CEA/IRFU, Gif-sur-Yvette, France
 
  As In-Kind contributor to E-XFEL project, CEA is committed to the integration on the Saclay site of the 100 cryomodules of the superconducting linac as well as to the procurement of the magnetic shieldings, superinsulation blankets and 31 cold beam position monitors of the re-entrant type. The assembly infrastructure has been renovated from the previous Saturne Synchrotron Laboratory facility: it includes a 200 m2 clean room complex with 120 m2 under ISO4, 1325 m2 of assembly platforms and 400 m2 of storage area. In parallel, CEA has conducted industrial studies and three cryomodule assembly prototyping both aiming at preparing the industrial file, the quality management system and the commissioning of the assembly plant, tooling and control equipments. In 2012, the contract of the integration will be placed to a subcontractor. The paper will summarize the outputs of the preparation and prototyping phases and the up-coming industrial phase.  
 
THPB034 Status of the FAIR 70 MeV Proton Linac 927
 
  • L. Groening, W.A. Barth, R. Berezov, G. Clemente, P. Forck, R. Hollinger, A. Krämer, C. Mühle, J. Pfister, G. Schreiber, J. Trüller, W. Vinzenz, C. Will
    GSI, Darmstadt, Germany
  • N. Chauvin, O. Delferrière, O. Tuske
    CEA/IRFU, Gif-sur-Yvette, France
  • B. Koubek, H. Podlech, U. Ratzinger, A. Schempp, R. Tiede
    IAP, Frankfurt am Main, Germany
  • B. Launé, J. Lesrel
    IPN, Orsay, France
  • C.S. Simon
    CEA/DSM/IRFU, France
 
  To provide the primary proton beam for the FAIR anti-proton research program, a 70 MeV, 70 mA linac is currently under design & construction at GSI. The nc machine comprises an ECR source, a 3 MeV RFQ, and a DTL based on CH-cavities. Up to 36 MeV pairs of rf-coupled cavities (CCH) are used. A prototype cavity has been built and is prepared for high power rf-testing. An overview of the status as well as on the perspectives of the project is given.  
 
THPB083 Status of E-XFEL String and Cryomodule Assembly at CEA-Saclay 1017
 
  • C. Madec
    CEA, Gif-sur-Yvette, France
  • S. Berry, J.-P. Charrier, A. Daël, M. Fontaine, Y. Gasser, O. Napoly, Y. Sauce, C.S. Simon, T.V. Vacher, B. Visentin
    CEA/DSM/IRFU, France
  • A. Brasseur, P. Charon, C. Cloué, S. Langlois, G. Monnereau, J.L. Perrin, D. Roudier, N. Sacépé
    CEA/IRFU, Gif-sur-Yvette, France
 
  As In-Kind contributor to E-XFEL project, CEA is committed to the integration on the Saclay site of the 100 cryomodules of the superconducting linac as well as to the procurement of the magnetic shieldings, superinsulation blankets and 31 cold beam position monitors of the re-entrant type. The assembly infrastructure has been renovated from the previous Saturne Synchrotron Laboratory facility: it includes a 200 m2 clean room complex with 120 m2 under ISO4, 1325 m2 of assembly platforms and 400 m2 of storage area. In parallel, CEA has conducted industrial studies and three cryomodule assembly prototyping both aiming at preparing the industrial file, the quality management system and the commissioning of the assembly plant, tooling and control equipments. In 2012, the contract of the integration will be placed to a subcontractor. The paper will summarize the outputs of the preparation and prototyping phases and the up-coming industrial phase.  
slides icon Slides THPB083 [1.868 MB]