Author: Napoly, O.
Paper Title Page
MOPB017 Integration of the European XFEL Accelerating Modules 207
 
  • E. Vogel, S. Barbanotti, J. Branlard, H. Brueck, S. Choroba, L. Hagge, K. Jensch, V.V. Katalev, D. Kostin, D. Käfer, L. Lilje, A. Matheisen, W.-D. Möller, D. Nölle, B. Petersen, J. Prenting, D. Reschke, H. Schlarb, M. Schmökel, J.K. Sekutowicz, W. Singer, H. Weise
    DESY, Hamburg, Germany
  • J. Świerbleski, P.B. Borowiec
    IFJ-PAN, Kraków, Poland
  • S. Berry, O. Napoly, B. Visentin
    CEA/DSM/IRFU, France
  • A. Bosotti, P. Michelato
    INFN/LASA, Segrate (MI), Italy
  • W. Kaabi
    LAL, Orsay, France
  • C. Madec
    CEA/IRFU, Gif-sur-Yvette, France
  • E.P. Plawski
    NCBJ, Świerk/Otwock, Poland
  • F. Toral
    CIEMAT, Madrid, Spain
 
  The production of the 103 superconducting accelerating modules for the European XFEL is an international effort. Institutes and companies from seven different countries (China, France, Germany, Italy, Poland, Russia and Spain), organized in 12 different work packages contribute with parts, capacity for work and facilities to the production of the modules. Currently the series production of the individual parts started or is approaching. Personnel are trained for the assembly and testing of parts and as well for the complete modules. Here we present an overview and the status of all these activities.  
 
THPLB09 Status of E-XFEL String and Cryomodule Assembly at CEA-Saclay 831
 
  • C. Madec
    CEA, Gif-sur-Yvette, France
  • S. Berry, J.-P. Charrier, A. Daël, M. Fontaine, Y. Gasser, O. Napoly, Y. Sauce, C.S. Simon, T.V. Vacher, B. Visentin
    CEA/DSM/IRFU, France
  • A. Brasseur, P. Charon, C. Cloué, S. Langlois, G. Monnereau, J.L. Perrin, D. Roudier, N. Sacépé
    CEA/IRFU, Gif-sur-Yvette, France
 
  As In-Kind contributor to E-XFEL project, CEA is committed to the integration on the Saclay site of the 100 cryomodules of the superconducting linac as well as to the procurement of the magnetic shieldings, superinsulation blankets and 31 cold beam position monitors of the re-entrant type. The assembly infrastructure has been renovated from the previous Saturne Synchrotron Laboratory facility: it includes a 200 m2 clean room complex with 120 m2 under ISO4, 1325 m2 of assembly platforms and 400 m2 of storage area. In parallel, CEA has conducted industrial studies and three cryomodule assembly prototyping both aiming at preparing the industrial file, the quality management system and the commissioning of the assembly plant, tooling and control equipments. In 2012, the contract of the integration will be placed to a subcontractor. The paper will summarize the outputs of the preparation and prototyping phases and the up-coming industrial phase.  
 
THPB083 Status of E-XFEL String and Cryomodule Assembly at CEA-Saclay 1017
 
  • C. Madec
    CEA, Gif-sur-Yvette, France
  • S. Berry, J.-P. Charrier, A. Daël, M. Fontaine, Y. Gasser, O. Napoly, Y. Sauce, C.S. Simon, T.V. Vacher, B. Visentin
    CEA/DSM/IRFU, France
  • A. Brasseur, P. Charon, C. Cloué, S. Langlois, G. Monnereau, J.L. Perrin, D. Roudier, N. Sacépé
    CEA/IRFU, Gif-sur-Yvette, France
 
  As In-Kind contributor to E-XFEL project, CEA is committed to the integration on the Saclay site of the 100 cryomodules of the superconducting linac as well as to the procurement of the magnetic shieldings, superinsulation blankets and 31 cold beam position monitors of the re-entrant type. The assembly infrastructure has been renovated from the previous Saturne Synchrotron Laboratory facility: it includes a 200 m2 clean room complex with 120 m2 under ISO4, 1325 m2 of assembly platforms and 400 m2 of storage area. In parallel, CEA has conducted industrial studies and three cryomodule assembly prototyping both aiming at preparing the industrial file, the quality management system and the commissioning of the assembly plant, tooling and control equipments. In 2012, the contract of the integration will be placed to a subcontractor. The paper will summarize the outputs of the preparation and prototyping phases and the up-coming industrial phase.  
slides icon Slides THPB083 [1.868 MB]