The Beam Commissioning Plan of Injector II in C-ADS |
32 |
|
- Z.J. Wang, Y. He, H. Jia, C. Li, S.H. Liu, W. Wu, X.B. Xu, B. Zhang, H.W. Zhao
IMP, Lanzhou, People's Republic of China
|
|
|
The design work of the Injector II, which is 10 MeV proton linac, in C-ADS project is being finished and some key elements are being fabricated. Now it is necessary to definite the operation mode of beam commissioning, including the selection of the beam current, pulse length and repetition frequency. Also the beam commissions plan should be specified. The beam commissions procedures is simulated with t-mode code GPT. In this paper, the general beam commissioning plan of Injector II in CIADS and simulation results of commissions procedures are presented.
|
|
|
TUPB039 |
Conceptual Design of Superconducting Heavy Ion Linear Injector for HIAF |
561 |
|
- Z.J. Wang, Y. He, H. Jia, C. Li, S.H. Liu, W. Wu, X.B. Xu, B. Zhang, H.W. Zhao
IMP, Lanzhou, People's Republic of China
|
|
|
A heavy ion accelerator facility, High Intensity Heavy Ion Accelerator Facility (HIAF), has been promoted by Institute of Modern Physics (IMP)of Chinese Academy of Sciences (CAS). The injector of the accelerator facility is a superconducting linac. It is a high intensity heavy ion linac and works on pulse mode. The final energy is 150 MeV/u. The accelerated species are from P to Uranium. The linac works with both laser and ECR ion source. The designed current is 20 emA. The general concept of HIAF and the preliminary design of linear injector are presented in the paper.
|
|
|
THPB026 |
The Beam Commissioning Plan of Injector II in C-ADS |
906 |
|
- Z.J. Wang, Y. He, H. Jia, C. Li, S.H. Liu, W. Wu, X.B. Xu, B. Zhang, H.W. Zhao
IMP, Lanzhou, People's Republic of China
|
|
|
The design work of the Injector II, which is 10 MeV proton linac, in C-ADS project is being finished and some key elements are being fabricated. Now it is necessary to definite the operation mode of beam commissioning, including the selection of the beam current, pulse length and repetition frequency. Also the beam commissions plan should be specified. The beam commissions procedures is simulated with t-mode code GPT. In this paper, the general beam commissioning plan of Injector II in CIADS and simulation results of commissions procedures are presented.
|
|
|
THPB039 |
Design of a Four-Vane RFQ for China ADS Project |
942 |
|
- Z.L. Zhang, X. Du, Y. He, X. Jin, C. Li, Y. Liu, A. Shi, L.P. Sun, B. Zhang, H.W. Zhao
IMP, Lanzhou, People's Republic of China
- M.D. Hoff, A.R. Lambert, D. Li, J.W. Staples, S.P. Virostek
LBNL, Berkeley, California, USA
- J. Wang
Lanzhou University of Technology, People's Republic of China
- C. Zhang
IAP, Frankfurt am Main, Germany
|
|
|
A four-vane RFQ accelerator has been designed for the ADS project which has been launched in China since 2011. As one of the front ends of C-ADS LINAC, the RFQ works at a frequency of 162.5 MHz, accelerating the proton beam from 35 keV to 2.1 MeV. Due to the CW (continuous wave) operating mode, a small Kilpatric factor of 1.2 was adopted. At the same time, Pi-mode rods are employed to reduce the effect of dipole mode on quadrupole mode, and cavity tuning will be implemented by temperature adjustment of cooling water. Beam dynamics design, RF cavity design, thermal and stress analysis all will be presented in the paper.
|
|
|