Author: Lempert, G.
Paper Title Page
MO1A01 Operational Experience and Future Goals of the SARAF Linac at SOREQ 100
 
  • D. Berkovits, A. Arenshtam, Y. Ben Aliz, Y. Buzaglo, O. Dudovich, Y. Eisen, I. Eliyahu, G. Feinberg, I. Fishman, I. Gavish, I.G. Gertz, A. Grin, S. Halfon, D. Har-Even, Y.F. Haruvy, T. Hirsch, D. Hirschmann, Z. Horvitz, B. Kaizer, D. Kijel, A. Kreisel, G. Lempert, J. Luner, I. Mardor, A. Perry, E. Reinfeld, J. Rodnizki, G. Shimel, A. Shor, I. Silverman, L. Weissman, E. Zemach
    Soreq NRC, Yavne, Israel
 
  SARAF-phase 1 at SOREQ, with its single 6 half-wave resonators cryomodule, is the first high current, superconducting low-beta linac in operation and it is presently delivering cw proton beams in the mA range. A phase 2 is foreseen for this linac which will allow acceleration up to 40 MeV of 2 mA cw proton and deuteron beams. The project status, the operational experience and the future goals of SARAF should be described.  
slides icon Slides MO1A01 [3.276 MB]