Paper | Title | Page |
---|---|---|
MO1A01 | Operational Experience and Future Goals of the SARAF Linac at SOREQ | 100 |
|
||
SARAF-phase 1 at SOREQ, with its single 6 half-wave resonators cryomodule, is the first high current, superconducting low-beta linac in operation and it is presently delivering cw proton beams in the mA range. A phase 2 is foreseen for this linac which will allow acceleration up to 40 MeV of 2 mA cw proton and deuteron beams. The project status, the operational experience and the future goals of SARAF should be described. | ||
Slides MO1A01 [3.276 MB] | ||