Paper | Title | Page |
---|---|---|
MOPB054 | Test Results of Tesla-style Cryomodules at Fermilab | 297 |
|
||
Funding: Operated by Fermi Research Alliance, LLC under Contract No. DE-AC02-07CH11359 with the United States Department of Energy. Commissioning and operation of the first Tesla-style Cryomodule (CM-1) at Fermilab was concluded in recent months. It has now been replaced by a second Tesla Type III+ module, RFCA002. It is the first 8-cavity ILC style cryomodule to be built at Fermilab and also the first accelerating cryomodule of the Advanced Superconducting Test Accelerator (ASTA). We report on the operating results of both of these cryomodules. |
||
TH1A01 | Results Achieved by the S1-Global Collaboration for ILC | 748 |
|
||
The S1-Global collaboration (scope and plans presented at Linac10) ended successfully in 2011. In the S1-Global experiment several variants of ILC components (e.g. cavities, tuners, modules, couplers) proposed by all SCRF collaborators worldwide have been extensively tested and their performances compared, in order to build consensus for the technical choices towards the ILC TDR and to develop further the concept of plug-compatible components for ILC. The experiment has been carried at KEK with contribution of hardware and manpower from all collaborators. | ||
Slides TH1A01 [6.656 MB] | ||