|
- J.K. Sekutowicz, V. Ayvazyan, J. Branlard, M. Ebert, J. Eschke, A. Gössel, D. Kostin, W. Merz, F. Mittag, R. Onken
DESY, Hamburg, Germany
- W. Cichalewski, W. Jałmużna, A. Piotrowski, K.P. Przygoda
TUL-DMCS, Łódź, Poland
- K. Czuba, Ł. Zembala
Warsaw University of Technology, Institute of Electronic Systems, Warsaw, Poland
- I.M. Kudla, J. Szewiński
NCBJ, Świerk/Otwock, Poland
|
|
|
In summer 2011, we have performed the first test of continuous wave (cw) and long pulse (lp) operation of the XFEL prototype cryomodule, which originally has been designed for short pulse operation. In April and June 2012, the second test took place, with the next cryomodule prototype. For that test cooling in the cryomodule was improved and new LLRF system has been implemented. In this contribution we discuss results of the second RF test of these new types of operation, which can in the future extend flexibility in the time beam structure of the European XFEL facility
|
|