TH2A03 Design and Construction of the Linac4 Accelerating Structures 778
 
  • F. Gerigk, Y. Cuvet, A. Dallocchio, G. Favre, J.-M. Geisser, L. Gentini, J.-M. Giguet, S.J. Mathot, M. Polini, S. Ramberger, B. Riffaud, C. Rossi, P. Ugena Tirado, M. Vretenar, R. Wegner
    CERN, Geneva, Switzerland
  • E. Kendjebulatov, Ya.G. Kruchkov, A.G. Tribendis
    BINP SB RAS, Novosibirsk, Russia
  • M.Y. Naumenko
    RFNC-VNIITF, Snezhinsk, Chelyabinsk region, Russia
 
  The Linac4 project at CERN is at an advanced state of construction. Prototypes of the different types of accelerating structures (RFQ, DTL, CCDTL and pi-mode structures) have been built and are presently tested. This paper gives the status of the cavity production and reviews the RF and mechanical design of the various structure types. Furthermore the production and the first test results shall be presented.  
slides icon Slides TH2A03 [2.675 MB]  
 
THPB010 Progress in the Construction of Linac4 at CERN 864
 
  • M. Vretenar, L. Arnaudon, P. Baudrenghien, G. Bellodi, C. Bertone, Y. Body, J.C. Broere, O. Brunner, M.C.L. Buzio, C. Carli, J.-P. Corso, J. Coupard, A. Dallocchio, N. Dos Santos, J.-F. Fuchs, A. Funken, R. Garoby, F. Gerigk, L. Hammouti, K. Hanke, J. Hansen, I. Kozsar, J.-B. Lallement, J. Lettry, A.M. Lombardi, L.A. Lopez Hernandez, C. Maglioni, S.J. Mathot, B. Mikulec, D. Nisbet, M.M. Paoluzzi, B. Puccio, U. Raich, S. Ramberger, F. Roncarolo, C. Rossi, N. Schwerg, R. Scrivens, G. Vandoni, J. Vollaire, R. Wegner, S. Weisz, Th. Zickler
    CERN, Geneva, Switzerland
 
  As first step of the LHC luminosity upgrade program CERN is building a new 160 MeV H¯ linear accelerator, Linac4, to replace the ageing 50 MeV Linac2 as injector to the PS Booster (PSB). Linac4 is an 86-m long normal-conducting linac made of a 3 MeV injector followed by 22 accelerating cavities of three different types. The general service infrastructure has been installed in the new tunnel and surface building and its commissioning is progressing; high power RF equipment is being installed in the hall and installations in the tunnel will start soon. Construction of the accelerator parts is in full swing involving industry, the CERN workshops and a network of international collaborations. The injector section including a newly designed and built H¯ source, a 3-m long RFQ and a chopping line is being commissioned in a dedicated test stand. Beam commissioning of the linac will take place in steps of increasing energy between 2013 and 2014. From end of 2014 Linac4 could deliver 50 MeV protons in case of Linac2 failure, while 160 MeV H¯ could be injected into the PSB from end of 2015; the exact start of the LHC shut-down required for connection will be coordinated with its experiments.