Integration of the European XFEL Accelerating Modules |
207 |
|
- E. Vogel, S. Barbanotti, J. Branlard, H. Brueck, S. Choroba, L. Hagge, K. Jensch, V.V. Katalev, D. Kostin, D. Käfer, L. Lilje, A. Matheisen, W.-D. Möller, D. Nölle, B. Petersen, J. Prenting, D. Reschke, H. Schlarb, M. Schmökel, J.K. Sekutowicz, W. Singer, H. Weise
DESY, Hamburg, Germany
- J. Świerbleski, P.B. Borowiec
IFJ-PAN, Kraków, Poland
- S. Berry, O. Napoly, B. Visentin
CEA/DSM/IRFU, France
- A. Bosotti, P. Michelato
INFN/LASA, Segrate (MI), Italy
- W. Kaabi
LAL, Orsay, France
- C. Madec
CEA/IRFU, Gif-sur-Yvette, France
- E.P. Plawski
NCBJ, Świerk/Otwock, Poland
- F. Toral
CIEMAT, Madrid, Spain
|
|
|
The production of the 103 superconducting accelerating modules for the European XFEL is an international effort. Institutes and companies from seven different countries (China, France, Germany, Italy, Poland, Russia and Spain), organized in 12 different work packages contribute with parts, capacity for work and facilities to the production of the modules. Currently the series production of the individual parts started or is approaching. Personnel are trained for the assembly and testing of parts and as well for the complete modules. Here we present an overview and the status of all these activities.
|
|
|
THPLB09 |
Status of E-XFEL String and Cryomodule Assembly at CEA-Saclay |
831 |
|
- C. Madec
CEA, Gif-sur-Yvette, France
- S. Berry, J.-P. Charrier, A. Daël, M. Fontaine, Y. Gasser, O. Napoly, Y. Sauce, C.S. Simon, T.V. Vacher, B. Visentin
CEA/DSM/IRFU, France
- A. Brasseur, P. Charon, C. Cloué, S. Langlois, G. Monnereau, J.L. Perrin, D. Roudier, N. Sacépé
CEA/IRFU, Gif-sur-Yvette, France
|
|
|
As In-Kind contributor to E-XFEL project, CEA is committed to the integration on the Saclay site of the 100 cryomodules of the superconducting linac as well as to the procurement of the magnetic shieldings, superinsulation blankets and 31 cold beam position monitors of the re-entrant type. The assembly infrastructure has been renovated from the previous Saturne Synchrotron Laboratory facility: it includes a 200 m2 clean room complex with 120 m2 under ISO4, 1325 m2 of assembly platforms and 400 m2 of storage area. In parallel, CEA has conducted industrial studies and three cryomodule assembly prototyping both aiming at preparing the industrial file, the quality management system and the commissioning of the assembly plant, tooling and control equipments. In 2012, the contract of the integration will be placed to a subcontractor. The paper will summarize the outputs of the preparation and prototyping phases and the up-coming industrial phase.
|
|
|
THPB083 |
Status of E-XFEL String and Cryomodule Assembly at CEA-Saclay |
1017 |
|
- C. Madec
CEA, Gif-sur-Yvette, France
- S. Berry, J.-P. Charrier, A. Daël, M. Fontaine, Y. Gasser, O. Napoly, Y. Sauce, C.S. Simon, T.V. Vacher, B. Visentin
CEA/DSM/IRFU, France
- A. Brasseur, P. Charon, C. Cloué, S. Langlois, G. Monnereau, J.L. Perrin, D. Roudier, N. Sacépé
CEA/IRFU, Gif-sur-Yvette, France
|
|
|
As In-Kind contributor to E-XFEL project, CEA is committed to the integration on the Saclay site of the 100 cryomodules of the superconducting linac as well as to the procurement of the magnetic shieldings, superinsulation blankets and 31 cold beam position monitors of the re-entrant type. The assembly infrastructure has been renovated from the previous Saturne Synchrotron Laboratory facility: it includes a 200 m2 clean room complex with 120 m2 under ISO4, 1325 m2 of assembly platforms and 400 m2 of storage area. In parallel, CEA has conducted industrial studies and three cryomodule assembly prototyping both aiming at preparing the industrial file, the quality management system and the commissioning of the assembly plant, tooling and control equipments. In 2012, the contract of the integration will be placed to a subcontractor. The paper will summarize the outputs of the preparation and prototyping phases and the up-coming industrial phase.
|
|
|