A   B   C   D   E   F   G   H   I   K   L   M   N   O   P   Q   R   S   T   U   V   W  

drift-tube-linac

Paper Title Other Keywords Page
MO4-54 Procedures for Setting RF Phase and Amplitude in SSC Drift-Tube-Linac Tanks simulation, DTL, linac, cavity 196
 
  • F.W. Guy, J.W. Hurd
    SSCL, Dallas, Texas, USA