Yoshino, K.

Paper Title Page
THP085 Transportation of the DTL/SDTL for the J-PARC 782
 
  • T. Ito
    JAEA/LINAC, Ibaraki-ken
  • H. Asano, T. Morishita
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • Z. Kabeya, S. Kakizaki, K. Suzuki
    MHI, Nagoya
  • T. Kato, F. Naito, E. Takasaki, H. Tanaka, K. Yoshino
    KEK, Ibaraki
 
  Three DTL tanks and 32 SDTL tanks for the Japan Proton Accelerator Research Complex (J-PARC) were assembled at KEK site. After the assembling, the aging of the DTL1 and 12 SDTL tanks and the beam acceleration test for the DTL1 was done. And then all the DTL and SDTL tanks have to be transported form KEK to JAEA. The distance is about 95km and special air suspension trailer is used. To confirm the effect to the accuracy of the drift tube alignment, we measured the displacement of the drift tube positions before and after the transportation by using a hot model tank. As a result of the test, the displacement of the drift tubes by the transportation was less than 0.02mm which meets our requirements. Based on this result, all the DTL and SDTL tanks were transported form KEK to JAEA. In this paper, the transportation results of the hot model tank and the DTL/SDTL tanks are described.