A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Spaedtke, P. S.

Paper Title Page
TU3001 High-Current Proton Beam Investigations at the SILHI-LEBT at CEA/Saclay 232
 
  • R. Hollinger, W. Barth, L. A. Dahl, M. Galonska, L. Groening, P. S. Spaedtke
    GSI, Darmstadt
  • R. Gobin, P.-A. Leroy
    CEA, Gif-sur-Yvette
  • O. Meusel
    IAP, Frankfurt-am-Main
 
  For the injection of a high current proton beam into the future proton LINAC at GSI for FAIR the ion source and the low energy beam transport system have to deliver a 100 mA proton beam with an energy of 95 keV within an acceptance of 0.3 mm mrad (normalized, rms) at the entrance of the RFQ. Besides the ion source a 2-solenoid focusing system is foreseen as an injection scheme for the subsequent RFQ. The beam parameters of the SILHI ion source and the 2-solenoid LEBT setup generally meet these requirements. Therefore joint emittance measurements on various beam parameters have been performed at the end of the LEBT system. In the frame work of the design study for the future proton LINAC it was a unique possibility to investigate the injection of a high current proton beam into a low energy beam transport system under the influence of space charge. The measurements reveal that a proton current of 100 mA can be achieved at the end of the LEBT while the emittance (95 %, rms, normalized) is as high as 0.3 to 0.5 mm mrad.  
THP089 Testbench of the HICAT RFQ at GSI 791
 
  • C. M. Kleffner, R. Baer, W. Barth, M. Galonska, F. Heymach, R. Hollinger, G. Hutter, W. Kaufmann, M. T. Maier, A. Reiter, B. Schlitt, M. Schwickert, P. S. Spaedtke, W. Vinzenz
    GSI, Darmstadt
  • A. Bechtold, A. Schempp
    IAP, Frankfurt-am-Main
  • R. Cee, E. Feldmeier, S. Vollmer
    HIT, Heidelberg
 
  In April 2006 the commissioning of the ion linac for the HICAT therapy facility in Heidelberg, Germany was started. In preparation of this commissioning process beam tests of the RFQ cavity with protons were carried out at GSI. The RFQ cavity for the HICAT facility was delivered to GSI in March 2005. The operation with an rf power up to 200 kW and a pulse width of 500 μsec could be accomplished successfully after a short time of rf-conditioning to assure the operation mode with carbon ions. A testbench for the RFQ cavity was constructed at GSI to allow for exact measurements of the output energy with the time of flight (ToF) method in addition to the beam tests at IAP Frankfurt. Due to the fact that the rebuncher is fully integrated into the RFQ rf-structure beam studies with different mechanical settings of the rebuncher had to be conducted. For each setting the effective voltage of the rebuncher could be estimated. The final mechanical setting was chosen with respect to required longitudinal matching to the IH structure behind of the RFQ.