Shang, L.

Paper Title Page
THP023 Status of and Future Plan for the NSRL Microwave Power System 616
 
  • L. Shang
    USTC/NSRL, Hefei, Anhui
 
  In this paper, 20MW microwave power system for NSRL (National synchrotron radiation Laboratory) Linac is introduced. The power system includes five s-band 20MW klystrons and their modulators. In 2002, the klystron modulators and the control system were upgraded. Constant-current, switching power supplies were employed to replace the old conventional LC resonant charging facilities. The new system has run for four years and played an important role in the operation of the 200MeV LINAC. A new soft x-ray FEL project (HTF) is now proposed in NSRL, the energy of electron beam will be increase from 200MeV to 800MeV. Seven s-band 80 MW klystrons and modulators will be employed as the new microwave power sources. The low energy spread specification of the Linac sets a stringent requirement to the stability of the klystron modulators. The paper also presents the technical considerations and preliminary design of the new system