A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Nakajima, H.

Paper Title Page
THP022 Status of RF Sources in Super-Conducting RF Test Facility (STF) at KEK 613
 
  • S. Fukuda, M. Akemoto, H. Hayano, H. Katagiri, S. Kazakov, S. Matsumoto, T. Matsumoto, S. Michizono, H. Nakajima, K. Nakao, T. Shidara, T. Takenaka, Y. Yano, M. Yoshida
    KEK, Ibaraki
 
  Super-conducting rf test facility (STF) has been progessing in KEK since 2005. In this paper, we describe the current status of rf sources in STF. STF rf sources comprise of a long pulse modulator with bouncer circuit, a pulse transformer, an L-band 5MW klystron, power distribution system and low level rf system. We have completed the construction of the first rf system and have been testing for the system evaluation and for the coupler test of the super-conducting cavity. We have a schedule to feed a power to the cryomodule with 8 super-conducting cavities in December of 2006. We also describe the plan of the second rf sources of STF.  
THP027 Study of PPM-Focused X-band Pulse Klystron 628
 
  • S. Matsumoto, M. Akemoto, S. Fukuda, T. Higo, H. Honma, S. Kazakov, N. K. Kudo, H. Nakajima, T. Shidara, M. Yoshida
    KEK, Ibaraki
 
  The R&D of PPM (Periodic Permanent Magnet)-focused X-band pulse klystrons has been conducted since 1999, originally for Global Linear Collider (GLC) project. So far six prototype tubes have been tested. Some of them successfully produce the power required in GLC (75MW, 1.6μsec pulse width). However their performance was not perfect as a GLC tube. The problems are the stability of RF output and the gun performance. Since GLC programs were terminated in 2004, some limited work on the improvement of the PPM tubes continues at X-Band Test Facility (XTF) in KEK. The work includes the test to evaluate the performance of revised (rebuilt) tubes as well as disassembling these tubes after the test for further inspection. Recent results are reported.  
THP036 Long-Pulse Modulator for the Superconducting RF Test Facility at KEK 655
 
  • M. Akemoto, S. Fukuda, H. Honma, H. Nakajima, T. Shidara
    KEK, Ibaraki
 
  A long-pulse modulator for the Superconducting RF Test Facility(STF) at KEK is under development now. The modulator is a direct-switched type design with a bouncer circuit to compensate the output pulse droop, and operates the klystron up to 5 MW peak power, 1.5 ms rf pulse width and up to 5 pps repetition rate. The modulator is built by improving a klystron modulator system inherited from Power Reactor and Nuclear Fuel Corp. The design and specifications of the modulator as well as R&D status for ILC modulator are described.