Paper |
Title |
Page |
MOP040 |
Design of the PEFP 100-MeV Linac
|
130 |
|
- J.-H. Jang, Y.-S. Cho, K. Y. Kim, Y.-H. Kim, H.-J. Kwon
KAERI, Daejon
|
|
|
The Proton Engineering Frontier Project (PEFP) is constructing a 100 MeV proton linac in order to provide 20 MeV and 100 MeV proton beams. The linac consists of a 50 keV proton injector, a 3 MeV radio-frequency quadrupole (RFQ), a 20 MeV drift tube linac (DTL), a medium energy beam transport (MEBT), and the higher energy part (20 MeV ~ 100 MeV) of the 100 MeV DTL. The MEBT is located after the 20 MeV DTL in order to extract 20 MeV proton beams as well as to match the proton beam into the higher energy part of the linac. The 20 MeV part of the linac was completed and is now under beam test. The higher energy part of the PEFP linac was designed to operate with 8% beam duty and is now under construction. This brief report discusses the design of the PEFP 100MeV linac as well as the MEBT.
|
|
WE2004 |
100 MeV High-Duty-Factor Proton Linac Development at KAERI
|
501 |
|
- Y.-S. Cho, H. M. Choi, I.-S. Hong, J.-H. Jang, H. S. Kim, K. Y. Kim, Y.-H. Kim, H.-J. Kwon, K. T. Seol, Y.-G. Song
KAERI, Daejon
|
|
|
The Proton Engineering Frontier Project (PEFP) is developing a 100 MeV high-duty-factor proton linac, which consists of a 50 keV proton injector, a 3 MeV radio frequency quadrupole, a 20 MeV drift tube linac, a 20 MeV beam transport line, a 100 MeV drift tube linac, and a 100 MeV beam transport line. It will supply proton beams of 20 MeV and 100 MeV to users for proton beam applications with the beam duty factor of 24% and 8% respectively. The 20 MeV front-end accelerator with CW RF systems had been constructed at KAERI test stand, and the rest part of the accelerator is being fabricated and will be installed in the new site at Gyeongju City. The preliminary results of the 20 MeV proton linac and the status of the 100 MeV proton linac will be presented.
|
|