A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Geschonke, G.

Paper Title Page
MO2001 Status of the CLIC Test Facility (CTF3) 11
 
  • G. Geschonke
    CERN, Geneva
 
  The CTF3 project, being built within the frame-work of an international collaboration involving more than 12 institutions, is advancing as planned. To date, the electron linac with its sub-harmonic bunching system, the magnetic chicane for bunch-length variations, and the Delay Loop have been installed. The 1.5 GHz sub-harmonic bunching system with fast phase switching allows the longitudinal position of the bunches to be changed every 140 ns. This phase-coded beam has been successfully injected into the Delay Loop using an RF deflector and bunch interleaving of 140 ns long sub-bunch trains which double the bunch repetition frequency has been demonstrated in the extraction line. In addition to its role as a test bed for the CLIC RF power source, CTF3 is being used as a source of high-power RF at 30 GHz for the testing of CLIC accelerating structures. In this power-generating mode, about 100 MW of 30 GHz power is routinely extracted from the beam half-way up the linac by special-purpose power-extracting structures and transported to the high-gradient test area by low-loss waveguides. This paper describes the overall status of the CTF3 project and outlines the plans for the future.