A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Galdemard, P.

Paper Title Page
THP039 Status of the RF Systems for the SPIRAL2 Linac at the Beginning of the Construction Phase 664
 
  • M. Di Giacomo, B. Ducoudret, M. Tripon
    GANIL, Caen
  • P. De Antoni, P. Galdemard, M. Luong, O. Piquet
    CEA, Gif-sur-Yvette
 
  The Spiral 2 project uses an RFQ and a superconductiong linac to accelerate high intensity beams of deuterons and heavier ions. The accelatoror frequency is 88 MHz. The construction phase was approved in Mai 2005 and the project organization was recently finalized. The RF Systems activity includes power amplifiers and control electronics for all the accelerator and some of the RF devices on the beam line: the slow and fast chopper and the rebunchers. The paper describes the status of the amplifiers prototypes, the architecture chosen for the digital LLRF and the preliminary studies on the other RF devices.