A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Dimitrov, G.

Paper Title Page
MOP020 Status of the PITZ Facility Upgrade 76
 
  • A. Oppelt, K. Abrahamyan, G. Asova, J. W. Baehr, G. Dimitrov, H.-J. Grabosch, L. Hakobyan, Ye. Ivanisenko, S. Khodyachykh, S. A. Korepanov, M. Krasilnikov, B. Petrosyan, R. Spesyvtsev, L. Staykov, F. Stephan
    DESY Zeuthen, Zeuthen
  • J. H. Han
    DESY, Hamburg
  • O. Kalekin
    Humboldt Universität zu Berlin, Berlin
  • F. Marhauser, R. Richter, E. Weihreter
    BESSY GmbH, Berlin
  • J. R. Roensch
    Uni HH, Hamburg
 
  The upgrade of the Photo Injector Test Facility at DESY in Zeuthen towards the PITZ2 stage is continuously ongoing. In Spring 2006, an intermediate stage was taken into operation (PITZ1.6), including a new gun cavity that has been tuned and conditioned. Currently, three new emittance measurement systems are being installed along the beamline. After their commissioning, studies of the emittance conservation principle will be possible when using the available booster cavity. In the paper, the results of the RF commissioning of the new gun and the first beam measurements using recently installed diagnostics devices will be presented. The ongoing developments of further new diagnostics components will be discussed as well.