Paper |
Title |
Page |
MOP002 |
Efficient Long-Pulse, Fully Loaded CTF3 Linac Operation
|
31 |
|
- P. Urschütz, H.-H. Braun, R. Corsini, S. Doebert, E. Jensen, F. Tecker
CERN, Geneva
|
|
|
An efficient RF to beam energy transfer in the accelerating structures of the drive beam is on of the key points of the Compact Linear Collider (CLIC) RF power source. For this, the structures are fully beam-loaded, i.e. the accelerating gradient is nearly zero at the downstream end of each structure. In this way, about 96% of the RF energy can be transferred to the beam. To demonstrate this mode of operation, 1500 ns long beam pulses are accelerated in six fully loaded structures in the CLIC Test Facility (CTF3) Linac. In the paper we present the results of experimental studies on this mode of operation, compare them with theoretical predictions and discuss its potential use in CLIC.
|
|