A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Asano, H.

Paper Title Page
THP068 RF Characteristics of the SDTL for the J-PARC 740
 
  • T. Ito, H. Asano, T. Morishita
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • T. Kato, F. Naito, E. Takasaki, H. Tanaka
    KEK, Ibaraki
 
  For the J-PARC linac, a Separated type DTL (SDTL) is used to accelerate an H- ion beam from 50MeV to 191MeV. The SDTL consists of 32 tanks and the operating frequency is 324MHz. It has 4 drift tubes and 2 half tubes (5cells), 2 fix tuners, 1 movable tuner and 1 RF input coupler. The inner diameter is 520mm and the length is approximately from 1.5m (SDTL1) to 2.5m (SDTL32). The focusing magnets are set between the tanks. We have measured the RF characteristics of the SDTL tanks and adjusted the field distribution since last summer. The measured Q value was above 90% of ideal SUPERFIS value, the field distribution was adjusted within ±1% for all the tanks. In this paper, the results of RF measurements of the SDTL tanks are described.  
THP069 DTL and SDTL Installation for the J-PARC 743
 
  • F. Naito, E. Takasaki, H. Tanaka
    KEK, Ibaraki
  • H. Asano, T. Ito, T. Morishita
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
 
  Three DTL tanks and 30 SDTL tanks have been installed precisely in the under-ground tunnel of the J-PARC project. The alignment of the tank was mainly done by using an alignment telescope. The distance of the center axis of the tank from the beam axis was measured by the telescope of which axis is in the beam line. The distance is minimized by adjusting the position of the tank on the stand. The beam axis in the tank is defined by the two optical target which are put on the template fixed on both ends of the tank cylinder for the DTL. After the installation of the tanks the movable tuners and the input couplers were also fixed on the tank. In the paper the measured tank position will be described in detail.  
THP085 Transportation of the DTL/SDTL for the J-PARC 782
 
  • T. Ito
    JAEA/LINAC, Ibaraki-ken
  • H. Asano, T. Morishita
    JAEA/J-PARC, Tokai-Mura, Naka-Gun, Ibaraki-Ken
  • Z. Kabeya, S. Kakizaki, K. Suzuki
    MHI, Nagoya
  • T. Kato, F. Naito, E. Takasaki, H. Tanaka, K. Yoshino
    KEK, Ibaraki
 
  Three DTL tanks and 32 SDTL tanks for the Japan Proton Accelerator Research Complex (J-PARC) were assembled at KEK site. After the assembling, the aging of the DTL1 and 12 SDTL tanks and the beam acceleration test for the DTL1 was done. And then all the DTL and SDTL tanks have to be transported form KEK to JAEA. The distance is about 95km and special air suspension trailer is used. To confirm the effect to the accuracy of the drift tube alignment, we measured the displacement of the drift tube positions before and after the transportation by using a hot model tank. As a result of the test, the displacement of the drift tubes by the transportation was less than 0.02mm which meets our requirements. Based on this result, all the DTL and SDTL tanks were transported form KEK to JAEA. In this paper, the transportation results of the hot model tank and the DTL/SDTL tanks are described.