Paper |
Title |
Page |
MOP49 |
Status And Operating Experience of The TTF Coupler
|
156 |
|
- W.-D. Möller, D. Kostin
DESY, Hamburg
|
|
|
Five accelerating modules are installed in the VUV FEL linac so far. This includes 40 high power couplers connected to the superconducting cavities, eight in every module. All of them are processed and operated up to the cavity performance limits. The coupler processing procedure is described. The performance in relation to the test results on the coupler test stands are discussed.
|
|
|
Transparencies
|
MOP67 |
TESLA RF Power Coupler Thermal Calculations
|
174 |
|
- D. Kostin, M. Dohlus, W.-D. Möller
DESY, Hamburg
|
|
|
The main RF power coupler is one of the key elements of the accelerating module for the superconducting linac. It provides RF power to the cavity and interconnect different temperature layers in the module. Therefore statistical and dynamical thermal losses have to be optimized. Different operating modes as well as geometries were investigated. Coupler design optimization studies are carried out for TESLA and for the XFEL case. Especially long pulse operation for the X-FEL is being investigated.
|
|