MOP49 Status And Operating Experience of The TTF Coupler 156
 
  • W.-D. Möller, D. Kostin
    DESY, Hamburg
 
  Five accelerating modules are installed in the VUV FEL linac so far. This includes 40 high power couplers connected to the superconducting cavities, eight in every module. All of them are processed and operated up to the cavity performance limits. The coupler processing procedure is described. The performance in relation to the test results on the coupler test stands are discussed.  
Transparencies
MOP67 TESLA RF Power Coupler Thermal Calculations 174
 
  • D. Kostin, M. Dohlus, W.-D. Möller
    DESY, Hamburg
 
  The main RF power coupler is one of the key elements of the accelerating module for the superconducting linac. It provides RF power to the cavity and interconnect different temperature layers in the module. Therefore statistical and dynamical thermal losses have to be optimized. Different operating modes as well as geometries were investigated. Coupler design optimization studies are carried out for TESLA and for the XFEL case. Especially long pulse operation for the X-FEL is being investigated.  
THP32 New Accelerating Modules RF Test at TTF 672
 
  • D. Kostin
    DESY, Hamburg
 
  Five new accelerating modules were installed into the TTF tunnel as a part of the VUV FEL Linac. They are tested prior to the linac operation. The RF test includes processing of the superconducting cavities, as well as maximum module performance tests. The test procedure and the achieved performance together with the test statistical analysis are presented.