A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Kadokura, E.

Paper Title Page
TUP06 Results of the High-Power Conditioning and the First Beam Acceleration of the DTL-1 for J-PARC 300
 
  • F. Naito, S. Anami, J. Chiba, Y. Fukui, K. Furukawa, Z. Igarashi, K. Ikegami, M. Ikegami, E. Kadokura, N. Kamikubota, T. Kato, M. Kawamura, H. Kobayashi, C. Kubota, E. Takasaki, H. Tanaka, S. Yamaguchi, K. Yoshino
    KEK, Ibaraki
  • K. Hasegawa, Y. Kondo, A. Ueno
    JAERI, Ibaraki-ken
  • T. Itou, Y. Yamazaki
    JAERI/LINAC, Ibaraki-ken
  • T. Kobayashi
    J-PARC, Ibaraki-ken
 
  The first tank of the DTL for Japan Proton Accelerator Research Complex (J-PARC) was installed in the test facility at KEK. The DTL tank is 9.9 m in length and consists of the 76 cells. The resonant frequency of the tank is 324 MHz. After the installation of the tank, the high-power conditioning was carried out deliberately. Consequently the peak rf power of 1.3 MW (pulse repetition 50 Hz, pulse length 600 μs) was put into the tank stably. (The required power is about 1.1 MW for the designed accelerating field of 2.5 MV/m on the axis.) Following the conditioning, negative hydrogen beam, accelerated by the RFQ linac up to 3 MeV, was injected to the DTL and accelerated up to its design value of 19.7 MeV. The peak current of 30 mA was achieved with almost 100% transmission. In this paper, the conditioning history of the DTL and the result of the first beam test will be described.  
TUP87 Technologies of The Peripheral Equipments of The J-PARC DTL1 for the Beam Test 480
 
  • K. Yoshino, Y. Fukui, E. Kadokura, T. Kato, C. Kubota, F. Naito, E. Takasaki, H. Tanaka
    KEK, Ibaraki
  • T. Itou
    JAERI/LINAC, Ibaraki-ken
 
  First beam test of the DTL1 was performed in November of 2003 at KEK site. A 30 mA H- beam was successfully accelerated from 3 to 19.7 MeV. In order to prepare the beam test, various peripheral equipments were developed: the electrode plates for connecting the hollow-conductor coil and the power cable were developed since quadrupole electromagnets are built in all DTs (77 sets) of the DTL1, the water-cooled multiconductor copper tube (Control Copper Tube) were used as the power cable from the electrode plate to power supply, and the interlock system assembled by PLCs (Programmable Logic Controller) was also prepared for the surveillance of many cooling channel.  
THP56 Control of the Low Level RF System for J-Parc Linac 739
 
  • S. Michizono, S. Anami, E. Kadokura, S. Yamaguchi
    KEK, Ibaraki
  • E. Chishiro, T. Kobayashi, .H. Suzuki
    JAERI, Ibaraki-ken
 
  A low level RF (LLRF) system for J-Parc linac generates RF and clock signals, drives a klystron, and stabilizes accelerating fields in the cavities. The LLRF system is controlled by two units: a programmable logic controller (PLC) and a compact PCI (cPCI) controller. Functions of the PLC are ON/OFF and UP/DOWN controls, and STATUS and ANALOG monitors. The PLC is locally operated by a touch panel, and remotely operated by an EPICS IOC with Ethernet communication. The cPCI controller is for RF feedback and feed-forward controls, including a cavity tuner control, and then, locally and remotely operated by communication with the PLC. On the other hand, RF waveform data, which are stored in the memory of DSP and CPU boards in the cPCI, are directory transmitted to an EPICS OPI by a request from EPICS.