A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Aleksandrov, V.

 
Paper Title Page
WE201 Results from the Initial Operations of the SNS Front End and Drift Tube Linac 533
 
  • V. Aleksandrov
    ORNL/SNS, Oak Ridge, Tennessee
 
  The Spallation Neutron Source accelerator systems will deliver a 1 GeV, 1.44 MW proton beam to a liquid mercury target for neutron scattering research. The accelerator complex consists of an H- injector (the Front-End), capable of producing one millisecond long pulses with 38 mA of peak current at a repetition rate of 60 Hz, a 1 GeV linear accelerator, an accumulator ring and associated transport lines. A 2.5 MeV beam from the injector is accelerated to 86 MeV in the Drift Tube Linac, then to 185 MeV in a Coupled-Cavity Linac and finally to 1 GeV in a Superconducting Linac. The staged beam commissioning of the accelerator is proceeding in parallel with component installation. The Front End and Drift Tube Linac tanks 1-3 have been commissioned at ORNL. The primary design goals of peak current, transverse emittance and beam energy have been achieved. Beam with 38 mA peak current, 1 msec beam pulse length, and 1 mA average beam current has been accelerated through the DTL tank 1. Results and status of the beam commissioning program will be presented.

* on behalf of the SNS Project

 
Transparencies