A   B   C   D   E   F   G   H   I   J   K   L   M   N   O   P   Q   R   S   T   U   V   W   X   Y   Z    

Ackermann, W.

 
Paper Title Page
TUP46 A New Control System for the S-DALINAC 372
 
  • M. Brunken, W. Ackermann, A. Araz, U. Bonnes, H.-D. Gräf, M. Hertling, A. Karnaukhov, W.F.O. Müller, O. Patalakha, M. Platz, A. Richter, B. Steiner, O. Titze, B. Truckses, T. Weiland
    TU Darmstadt, Darmstadt
 
  We will present recent results of the development of a new control system for the superconducting cw electron accelerator S-DALINAC. This system will be based on common industrial standards. Due to the large number of special devices existing to control the beamline, a simple and cheap communication interface is required to replace the current proprietary bus topology. The existing devices will be upgraded by a microcontroller based CAN bus interface as communication path to a control server. The servers themselves may be distributed over the location, giving required applications access to the device parameters through a TCP/IP connection. As application layer protocol for the Client Server communication a special binary protocol and a text protocol based on XML are considered.  
TUP47 The Photo Injector Test Facility at DESY Zeuthen: Results of the First Phase 375
 
  • A. Oppelt, K. Abrahamyan, I. Bohnet, J. Bähr, U. Gensch, H.-J. Grabosch, J.H. Han, M. Krasilnikov, D. Lipka, V. Miltchev, B. Petrosyan, L. Staykov, F. Stephan
    DESY Zeuthen, Zeuthen
  • W. Ackermann, W.F.O. Müller, S. Setzer, T. Weiland
    TU Darmstadt, Darmstadt
  • J.-P. Carneiro, K. Flöttmann, S. Schreiber
    DESY, Hamburg
  • E. Jaeschke, D. Krämer, D. Richter, M. von Hartrott
    BESSY GmbH, Berlin
  • P. Michelato, C. Pagani, D. Sertore
    INFN/LASA, Segrate (MI)
  • J. Rossbach
    Uni HH, Hamburg
  • W. Sandner, I. Will
    MBI, Berlin
  • I. Tsakov
    INRNE, Sofia
 
  The photo injector test facility at DESY Zeuthen successfully concluded it's first phase of operation in November 2003 (PITZ1). After a complete characterization of the injector, the gun has been delivered to Hamburg and has already been taken into operation on the VUV-FEL. The measurement program for the year 2003 included RF commissioning, emittance studies, momentum and bunch length measurements, and studies of the influence of the drive laser parameters. We provide an overview on the latest achievements in all of these topics.  
Transparencies