Sol Omolayo (Lawrence Berkeley National Laboratory)
TUPC13
Impedance evaluation, mitigation, and measurement of ALS-U vacuum components.
1029
The Advanced Light Source Upgrade (ALS-U) is a 4th generation diffraction-limited soft x-ray radiation source. Coupling-impedance-driven instabilities have been carefully evaluated to ensure meeting the machine’s high-performance goals during the design stage. At present, the focus of impedance modeling efforts primarily revolves around supporting beam tests of key components at ALS beamlines and the fabrication of various components. This paper presents impedance measurements of the main RF bellows with the Goubau-Line, as well as thermal evaluations on beam-induced heating on the RF bellows and the booster-to-accumulator ferrite (BTA) kicker on the ALS beamline. One challenge in the impedance modeling of the BTA kicker arises from a 4-micrometer-thick TiN coating, rendering direct modeling in CST challenging. To address this, we employed the ImpedanceWake2D (IW2D) code as an initial step to validate the efficacy of RF shielding. Subsequently, an equivalent model was constructed in CST to calculate the total impedance. We also show the impedance evaluation results and reduction strategies for the keyhole bellows and photon absorbers, incorporating thermal expansion considerations. Notably, the work is essential for successfully commissioning the ALS-U project.
Paper: TUPC13
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-TUPC13
About: Received: 16 May 2024 — Revised: 21 May 2024 — Accepted: 21 May 2024 — Issue date: 01 Jul 2024
TUPG37
Status of the Advanced Light Source
1309
The LBNL Advanced Light Source, a pioneering third-generation soft x-ray synchrotron radiation source operating at 1.89 GeV with a 2~nm beam emittance, stands as one of the earliest facilities in its class, continually evolving to maintain its status at the forefront of soft x-ray sources. This paper reviews the most significant advancements in the accelerator's hardware and software infrastructures and presents the machine operational statistics over the last 15 years.
Paper: TUPG37
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-TUPG37
About: Received: 12 May 2024 — Revised: 19 May 2024 — Accepted: 20 May 2024 — Issue date: 01 Jul 2024
TUPG38
Design and construction progress of ALS-U
1313
The ALS-U project to upgrade the Advanced Light Source to a multi bend achromat lattice received CD-3 approval in 2022 marking the start of the construction phase for the Storage Ring. Construction of the accumulator under a prior CD-3A authorization is already well advanced. ALS-U promises to deliver diffraction limited performance in the soft x-ray range by lowering the horizontal emittance to about 70 pm rad resulting in two orders of magnitude brightness increase for soft x-rays compared to the current ALS. The design utilizes a nine bend achromat lattice, with reverse bending magnets and on-axis swap-out injection utilizing an accumulator ring. It is optimized to produce intense beams of soft x-rays, which offer spectroscopic contrast, nanometer-scale resolution, and broad temporal sensitivity. This paper presents the final design, prototype results as well as construction progress.
Paper: TUPG38
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-TUPG38
About: Received: 21 May 2024 — Revised: 21 May 2024 — Accepted: 22 May 2024 — Issue date: 01 Jul 2024
WEPG61
Electromagnetic bench testing of ALS upgrade beam monitor buttons and assemblies
2365
The ALS Upgrade Project (ALS-U) consists in the replacement of the existing ALS storage ring and the addition of a new accumulator ring in order to decrease the horizontal beam emittance to about 70 pm·rad, resulting in an increase of two orders of magnitude in the soft X-Ray brightness. The vacuum chambers of two new rings, and of the transfer lines connecting them, will include 327 new beam position monitors (BPM). The design of these BPM is now largely completed and relies on the procurement of about 1,500 BPM buttons (including spares and prototypes) from commercial suppliers and their installation on the BPM chamber enclosures. Our design includes more than a dozen different BPM designs and almost as many different buttons. All the buttons, as well as the assembled BPM, have to undergo vacuum and RF testing to characterize them and detect defective units before their installation. In this paper, we describe our electromagnetic testing plan and report on the results covering the entire button production for the accumulator ring and the prototypes for the storage ring, as well as the electromagnetic measurement for the assembled ALS-U Accumulator Ring (AR) BPMs.
Paper: WEPG61
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-WEPG61
About: Received: 16 May 2024 — Revised: 20 May 2024 — Accepted: 20 May 2024 — Issue date: 01 Jul 2024