Janet Schmidt (GSI Helmholtzzentrum für Schwerionenforschung GmbH)
TUPR07
Development of a spill-structure manipulation cavity and first experiment with beam in SIS18
1432
For several years, significant effort has been spent at GSI to improve the time structure of the spill during slow extraction in SIS18. This led to the requirement to extend the possibilities to experimentally improve the micro-spill structure by partially or fully capturing the beam with an RF of more than 40 MHz. Therefore, a so-called spill-structure manipulation cavity was designed, realized and optimized which allows the mentioned experiments. In this contribution, the design of the cavity and the challenges of its realization are described, and measurement results concerning the first experimental operation in the SIS18 synchrotron are presented.
  • K. Gross, B. Zipfel, D. Lens, J. Schmidt, P. Spiller, R. Balss, T. Winnefeld, U. Laier
    GSI Helmholtzzentrum für Schwerionenforschung GmbH
  • H. Klingbeil
    Technische Universität Darmstadt
  • P. Hülsmann
    Deutsches Elektronen-Synchrotron
Paper: TUPR07
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-TUPR07
About:  Received: 14 May 2024 — Revised: 22 May 2024 — Accepted: 23 May 2024 — Issue date: 01 Jul 2024
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote