URLhttps://doi.org/10.18429/JACoW-IPAC2024-TUPS27
TitleProgress towards the completion of the proton power upgrade project
Authors
  • M. Champion, J. Galambos, J. Moss, M. Connell, M. Howell, S. Kim, N. Evans, K. White, G. Stephens
    Oak Ridge National Laboratory
  • G. Johns
    Los Alamos National Laboratory
  • E. Daly
    Thomas Jefferson National Accelerator Facility
  • D. Harding
    Fermi National Accelerator Laboratory
AbstractThe Proton Power Upgrade project at the Spallation Neutron Source at Oak Ridge National Laboratory will increase the proton beam power capability from 1.4 to 2.8 MW. Upon completion in early 2025, 2 MW of beam power will be available for neutron production at the existing first target station (FTS) with the remaining beam power available for the future second target station (STS). The project has installed seven superconducting radio-frequency (RF) cryomodules and supporting RF power systems to increase the beam energy by 30% to 1.3 GeV, and the beam current will be increased by 50%. The injection and extraction region of the accumulator ring are being upgraded, and a new 2 MW mercury target has been developed along with supporting equipment for high-flow gas injection to mitigate cavitation and fatigue stress. The first four cryomodules and supporting systems were commissioned in 2022-2023 and supported neutron production at 1.05 GeV, 1.7 MW with high reliability. The first-article 2 MW target was operated successfully for approximately 4400 MW-Hours over two run periods. The long outage began in August 2023 for installation of the remaining technical equipment and construction of the Ring-to-Target Beam Transport tunnel stub that will enable connection to the STS without interrupting operation of the FTS. The upgrade is proceeding on-schedule and on-budget, and resumption of neutron production for the user program is planned for July 2024.
Paperdownload: TUPS27.pdf
CiteBibTeX, LaTeX, Text/Word, RIS, EndNote
Conference15th International Particle Accelerator Conference
Series
LocationNashville, TN
Date19-24 May 2024
PublisherJACoW Publishing, Geneva, Switzerland
Editorial BoardFulvia Pilat - Oak Ridge National Laboratory Wolfram Fischer - Brookhaven National Laboratory Robert Saethre - Oak Ridge National Laboratory Petr Anisimov - Los Alamos National Laboratory Ivan Andrian - Elettra-Sincrotrone Trieste S.C.p.A.
Online ISBN978-3-95450-247-9
Online ISSN2673-5490
Received30 April 2024
Revised20 May 2024
Accepted20 May 2024
Issued01 July 2024
DOI10.18429/JACoW-IPAC2024-TUPS27
Pages1691-1694