Raubenheimer Tor
A reformulated accelerator R&D program as envisioned by the 2023 Particle Physics Project Prioritization Panel
The 2023 Particle Physics Project Prioritization Panel recommends an updated approach for accelerator R&D activities in the US research program. Key recommendations for the DOE-HEP General Accelerator R&D Program, a new targeted Collider R&D program, and the potential for increased engagement with the NSF are described.
TUPC67
Progress in the design of the future circular collider FCC-ee interaction region
1156
In this paper we discuss the latest developments for the FCC-ee interaction region layout, which represents one of the key ingredients to establish the feasibility of the FCC-ee. The collider has to achieve extremely high luminosities over a wide range of center-of-mass energies with two or four interaction points. The complex final focus hosted in the detector region has to be carefully designed, and the impact of beam losses and of any type of synchrotron radiation generated in the interaction region, including beamstrahlung, have to be evaluated in detail with simulations. We give an overview of the progress of the whole machine-detector-interface-related studies, among which are the updated mechanical model of the interaction region, the plans for a novel R&D activity of a IR mockup which is just starting, the collimation scheme and evaluation of beam induced backgrounds in the detectors, evaluation of radiation dose in the experimental area, and MDI integration with the detector.
Paper: TUPC67
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-TUPC67
About: Received: 14 May 2024 — Revised: 20 May 2024 — Accepted: 23 May 2024 — Issue date: 01 Jul 2024
WEPR02
The status of the FCC-ee optics tuning
2449
With a circumference of approximately 91 km, the Future Circular electron-positron Collider, FCC-ee, aims for unprecedented luminosities at beam energies from 45.6 to 182.5 GeV. A major challenge is reaching its design performance in the presence of magnet misalignments and field errors. The FCC-ee optics tuning working group studies all related aspects, and applies state-of-the-art techniques for beam-based alignment, commissioning simulations, beam threading, optics measurements and corrections, which are probed at numerous world-leading accelerator physics facilities. Advanced optics correction simulations include interaction-point tuning, magnetic tolerances are studied, and a new optics is under scrutiny. The current status of tuning simulations for different FCC-ee lattices is presented.
Paper: WEPR02
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-WEPR02
About: Received: 15 May 2024 — Revised: 22 May 2024 — Accepted: 23 May 2024 — Issue date: 01 Jul 2024
WEPR14
Selected advances in the accelerator design of the Future Circular Electron-Positron Collider (FCC-ee)
2493
In autumn 2023, the FCC Feasibility Study underwent a crucial “mid-term review”. We describe some accelerator performance risks for the proposed future circular electron- positron collider, FCC-ee, identified for, and during, the mid-term review. For the collider rings, these are the collective effects when running on the Z resonance – especially resistive wall, beam-beam, and electron cloud –, the beam lifetime, dynamic aperture, alignment tolerances, and beam-based alignment. For the booster, the primary concern is the vacuum system, with regard to impedance and effects of the residual gas. For the injector, the layout and the linac repetition rate are primary considerations. We discuss the various issues and report the planned mitigations.
Paper: WEPR14
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-WEPR14
About: Received: 11 May 2024 — Revised: 18 May 2024 — Accepted: 21 May 2024 — Issue date: 01 Jul 2024