Keane Robert
TUPG07
APS upgrade booster commissioning
1232
After a long shutdown, the Advanced Photon Source (APS) booster synchrotron was recently re-commissioned for the APS Upgrade (APS-U) project. The APS-U requirements for the booster are more demanding than the old APS: much higher bunch charge, reduced beam emittance, and improved charge stability of better than 5% shot to shot. The booster accelerates electron bunches of 1-12 nC from 425 MeV to 6 GeV at a 1 Hz rep rate. While the booster ring hardware was largely kept the same, it is now run on a separate RF source, which allows for frequency manipulation during the booster ramp. Photon diagnostics have recently been upgraded for reduced thermal drift. This paper will report on the booster re-commissioning process, including checkout of various systems, tests of the new RF source, and tuning for improved performance. It will also detail plans for further improvements, in particular for achieving even higher bunch charge.
Paper: TUPG07
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-TUPG07
About: Received: 15 May 2024 — Revised: 17 May 2024 — Accepted: 17 May 2024 — Issue date: 01 Jul 2024
THPS03
Precision current measurement and calibration system for the APS-U unipolar magnet power supplies
3726
The APS Upgrade (APS-U) multi-bend acromat storage ring requires 1000 high-stability unipolar magnet power supplies. A precision current measurement and calibration system has been developed to independently measure the power supply output current to ensure the accuracy and repeatability of the supplies. The measurement system uses custom commercial DCCT current transducers along with APS-U-designed electronics. The calibration system is designed to perform on-demand calibration of all 1000 DC measurement channels simultaneously using a single current reference source instrument. The calibration system includes a precision current multiplier and impedance buffer based on a novel use of DCCT technology that provides a local precision calibration current for up to 6 DCCTs in series through multi-turn low impedance calibration windings. All system components have been received and passed acceptance testing; the full system is currently being installed in the new storage ring and full-scale evaluation will begin in early 2024. This paper describes the system design and presents preliminary test results.
Paper: THPS03
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-THPS03
About: Received: 15 May 2024 — Revised: 18 May 2024 — Accepted: 18 May 2024 — Issue date: 01 Jul 2024