Czwalinna Marie Kristin
SUPG056
Real-time measurements of the RF-path of an electro-optical bunch arrival-time monitor with integrated planar pickup structure with low-charge electron beams at ELBE
use link to access more material from this paper's primary code
Ultra-low-charge operation of free-electron lasers down to 1 pC or even lower, requires adequate diagnostics for both, the users and the operators. For the electro-optical bunch-arrival time monitor (BAM) a fundamental design update is necessary to yield single-digit fs precision with such low charges. In 2023 a vacuum sealed demonstrator for a novel pickup structure with integrated combination network on a printed circuit board (PCB) was built for operation at the free-electron laser ELBE at HZDR. Together with a new low-pi-voltage ultra-wideband traveling wave electro-optical modulator, this concept reaches an estimated theoretical jitter charge product of 9 fs pC. Proof-of-concept measurements with the pickup demonstrator were carried out at ELBE.
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-WEPG82
About: Received: 15 May 2024 — Revised: 20 May 2024 — Accepted: 21 May 2024 — Issue date: 01 Jul 2024
WEPG82
Real-time measurements of the RF-path of an electro-optical bunch arrival-time monitor with integrated planar pickup structure with low-charge electron beams at ELBE
2407
Ultra-low-charge operation of free-electron lasers down to 1 pC or even lower, requires adequate diagnostics for both, the users and the operators. For the electro-optical bunch-arrival time monitor (BAM) a fundamental design update is necessary to yield single-digit fs precision with such low charges. In 2023 a vacuum sealed demonstrator for a novel pickup structure with integrated combination network on a printed circuit board (PCB) was built for operation at the free-electron laser ELBE at HZDR. Together with a new low-pi-voltage ultra-wideband traveling wave electro-optical modulator, this concept reaches an estimated theoretical jitter charge product of 9 fs pC. Proof-of-concept measurements with the pickup demonstrator were carried out at ELBE.
Paper: WEPG82
DOI: reference for this paper: 10.18429/JACoW-IPAC2024-WEPG82
About: Received: 15 May 2024 — Revised: 20 May 2024 — Accepted: 21 May 2024 — Issue date: 01 Jul 2024