MOXD1
Performance with the upgraded LHC injectors
1
The upgrade project for the LHC injectors is described in detail, highlighting the major improvements implemented in the injector chain. Lessons in technical progress, project management and planning are presented. The performance of the upgraded systems in intensity, average particle flux and beam brightness is described and compared to the upgrade goals and LHC`s original design parameters. The LHC performance with the upgraded injection chain and the luminosity achieved are presented. A future outlook to future developments is given.
  • M. Meddahi, G. Rumolo
    European Organization for Nuclear Research
Slides: MOXD1
Paper: MOXD1
DOI: reference for this paper: 10.18429/JACoW-IPAC2023-MOXD1
About:  Received: 01 May 2023 — Revised: 30 Jun 2023 — Accepted: 30 Jun 2023 — Issue date: 26 Sep 2023
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote
MOXD2
Elettra 2.0 – Italy’s lightsource for science and outreach
7
An overview of the project status of the future Italian 2.4 GeV 4th generation light source Elettra 2.0 that will replace the existing 3rd generation light source Elettra is presented, including challenges and perspectives in the design and construction of such light sources. Elettra 2.0 will be the ultra-low emittance light source that will provide ultra-high brilliance and coherence and at the same time also aims to provide very short pulses for time resolved experiments. The discussion includes the technical challenges requiring specific R&D studies, for example on injection schemes, high performance magnets, vacuum, diagnostics for stability, feed-backs, harmonic cavities, etc. The upgrade also addresses on the request from the established user community to minimize the duration of beam-time interruption, imposing the need of a careful organization and planning of all the phases of the project, from the removal of the old machine to the installation and successful commissioning of the new one.
  • E. Karantzoulis
    Elettra-Sincrotrone Trieste S.C.p.A.
Slides: MOXD2
Paper: MOXD2
DOI: reference for this paper: 10.18429/JACoW-IPAC2023-MOXD2
About:  Received: 04 May 2023 — Revised: 05 May 2023 — Accepted: 11 May 2023 — Issue date: 26 Sep 2023
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote