Meng Li (Chinese Academy of Sciences)
SUPM006
Problems and Considerations about the Injection Philosophy and Timing Structure for CEPC
use link to access more material from this paper's primary code
In this paper we will show the injection philosophy and the design of timing and filling scheme for high luminosity CEPC scheme under different energy modes. It is found that the RF frequency choice in CDR cannot meet the injection requirements for the bunch number at Z pole. A modified scheme was proposed to support the design luminosity,which basically meets our current design requirements and retains more flexibility for future high luminosity upgrade.
About: Received: 01 May 2023 — Revised: 13 May 2023 — Accepted: 16 Jun 2023 — Issue date: 26 Sep 2023
MOPA094
Problems and Considerations about the Injection Philosophy and Timing Structure for CEPC
264
In this paper we will show the injection philosophy and the design of timing and filling scheme for high luminosity CEPC scheme under different energy modes. It is found that the RF frequency choice in CDR cannot meet the injection requirements for the bunch number at Z pole. A modified scheme was proposed to support the design luminosity,which basically meets our current design requirements and retains more flexibility for future high luminosity upgrade.
Paper: MOPA094
DOI: reference for this paper: 10.18429/JACoW-IPAC2023-MOPA094
About: Received: 01 May 2023 — Revised: 13 May 2023 — Accepted: 16 Jun 2023 — Issue date: 26 Sep 2023
MOPL051
CEPC damping ring design in TDR stage
654
A damping ring system which includes a small 1.1 GeV ring and two transport lines is introduced in CEPC linac in order to reduce the transverse emittance of positron beam at the end of linac and hence reduce the beam loss in the booster. The repetition rate of Linac is 100 Hz and one-bunch-per-pulse is considered. The double-bunch scheme of Linac is only considered for the high luminosity mode at Z pole. The positron beam is generated by 4 GeV electron beam hitting tungsten target and then is captured by an AMD flux concentrator. Each positron bunch is injected into damping ring every 10 ms and two bunches are stored in the ring so that the storage time for each bunch is 20 ms. The bunch number in the damping ring can be increased to 4 with an upgrade and hence the storage time for each bunch can be increased to 40 ms. The reversed bending magnet scheme is adopted for TDR in order to reduce the emittance significantly. The normalized emittance of positron beam is expected to be reduced from 2500 mm.mrad to 166 mm.mrad (or 97 mm.mrad) in the damping ring.
Paper: MOPL051
DOI: reference for this paper: 10.18429/JACoW-IPAC2023-MOPL051
About: Received: 28 Apr 2023 — Revised: 10 May 2023 — Accepted: 20 Jun 2023 — Issue date: 26 Sep 2023
MOPL052
CEPC circumference optimization
658
The CEPC is a proposed high luminosity Higgs/Z factory, with the potential to be upgraded to top factory at center-of-mass energy of 360GeV. We perform an optimization study on the circumference of CEPC. We calculate the instant luminosity, the construction and operation cost for different circumferences. With respect to the total cost and average cost per particle, we conclude that the optimal circumference for the CEPC Higgs operation is 80 km. Taking into account of the Z pole operation, the potential high-energy upgrade of CEPC (top factory), the optimal circumference increased to 100 km. The long future proton-proton upgrade of CEPC (SPPC) also favors a larger circumference, and we conclude that 100 km is the global optimized circumference for this facility.
Paper: MOPL052
DOI: reference for this paper: 10.18429/JACoW-IPAC2023-MOPL052
About: Received: 28 Apr 2023 — Revised: 08 May 2023 — Accepted: 19 Jun 2023 — Issue date: 26 Sep 2023