Yan Fang
MOPA068
The investigation of cavity frequency instability induced by vibrations
184
The Beijing Electron-Positron Collider II (BEPC-II) is a 1.89 GeV two-ring e+/e- collider. It consists of two superconducting (SC) cavities in the ring and the design of the cavity is the same as the ones used in HEPS (High Energy Photo source) storage ring. During operation of the SC cavities of BEPC-II, sideband close to 46 Hz and 100 Hz were found, which decreased the controlling accuracy of the cavity frequency. To trace the vibration sources, PCB sensors were fixed on the rack which is connected directly with the cavity pipe. The whole starting up process of the BEPC-II after long shutting down were monitored for determining the vibration sources. To investigate the sensitivity of the cavity under different vibrations, 500 mV bias input voltage were added on the cavity using pizeo to produce longitudinal motions with frequencies from 10 Hz up to 150 Hz. With the same amplitude of bias voltage, the cavity has different response to vibrations with different frequencies. The preliminary results of the investigation will be presented in this paper.
  • F. Yan, J. Dai, Q. Ma, P. Zhang
    Institute of High Energy Physics
  • X. Huang, Q. Wang, N. Zhou
    Chinese Academy of Sciences
Paper: MOPA068
DOI: reference for this paper: 10.18429/JACoW-IPAC2023-MOPA068
About:  Received: 03 May 2023 — Revised: 12 May 2023 — Accepted: 20 Jun 2023 — Issue date: 26 Sep 2023
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote
MOPM002
Progress of physics studies and commissioning preparations for the High Energy Photon Source
980
The High Energy Photon Source (HEPS) is a 34-pm, 1360-m storage ring light source being built in the suburb of Beijing, China. The construction of HEPS started in mid-2019. Later, to deal with challenges emerging from the technical and engineering designs, the HEPS accelerator physics design was modified and had been finalized in 2020. Afterwards, studies on related physics issues were updated and have been basically finished. Besides, preparing studies for commissioning of the HEPS Linac, booster and storage ring were started almost at the same time, and are still underway. The commissioning of the Linac has been launched since early of 2023. In this paper, we will briefly introduce the updated studies on related physics issues and present the results of the Linac commissioning.
  • Y. Jiao, B. Wang, C. Meng, C. Yu, C. Du, D. Ji, F. Yan, G. Xu, H. Xu, H. Ji, J. Wan, J. Wang, N. Li, P. He, S. Tian, S. Yue, X. Lu, X. Cui, Y. Zhao, Y. Guo, Z. Duan
    Institute of High Energy Physics
  • H. Qu, J. Li, N. Wang, W. Pan, X. Li, X. Huang, Y. Peng, Y. Wang
    Chinese Academy of Sciences
  • K. Fan
    Huazhong University of Science and Technology
Paper: MOPM002
DOI: reference for this paper: 10.18429/JACoW-IPAC2023-MOPM002
About:  Received: 25 Apr 2023 — Revised: 07 May 2023 — Accepted: 16 Jun 2023 — Issue date: 26 Sep 2023
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote