Abbondanza Arturo
TUPM041
Status of 70 MeV Cyclotron at Laboratori Nazionali of Legnaro
2293
The 70MeV cyclotron at Laboratori Nazionali di Legnaro was installed and commissioned in 2017 and the accelerator was operational until March 2021. The shut down was foreseen in order to permit the completion of the SPES facility, while the resume of activities is expected on 2023. The status of the cyclotron and related high intensity beamlines will be presented as well as the last performance achieved in terms of accelerated current up to 1 MeV. Moreover the program of upgrade of the ancillary systems shall be discussed.
Paper: TUPM041
DOI: reference for this paper: 10.18429/JACoW-IPAC2023-TUPM041
About: Received: 03 May 2023 — Revised: 18 May 2023 — Accepted: 22 Jun 2023 — Issue date: 26 Sep 2023