Formento Alice
WEPM115
Progresses and design development for the CERN ISOLDE beam dumps exchange
3838
The CERN ISOLDE facility is currently equipped with two uncooled iron blocks acting as beam dumps. In order to guarantee the reliability and safety of the installation for the years to come, a study has been launched to evaluate the possibility to exchange the ISOLDE beam dumps during LS3. The consolidation would also allow compatibility with the 2 GeV and intensity upgrade being discussed. The contribution will detail the challenges of the project and the path being proposed to tackle them.
  • J. Martin Ruiz, A. Bernardes, M. Calviani, L. Esposito, A. Formento, E. Grenier-Boley, S. Marzari, S. Niang, A. Perillo Marcone, F. Pozzi, J. Vollaire
    European Organization for Nuclear Research
Paper: WEPM115
DOI: reference for this paper: 10.18429/JACoW-IPAC2023-WEPM115
About:  Received: 02 May 2023 — Revised: 07 May 2023 — Accepted: 11 May 2023 — Issue date: 26 Sep 2023
Cite: reference for this paper using: BibTeX, LaTeX, Text/Word, RIS, EndNote