Paper | Title | Page |
---|---|---|
MOPOST007 | Summary of the First Fully Operational Run of LINAC4 at CERN | 58 |
|
||
In December 2020 the newly commissioned LINAC4 started delivering beam for the CERN proton accelerator chain, replacing the old LINAC2. LINAC4 is a 352 MHz normal conducting linac, providing a beam of negative hydrogen ions at 160 MeV that are converted into protons at injection into the PS Booster synchrotron. In this paper we report on the achieved beam performance, availability, reproducibility and other operational aspects of LINAC4 during its first fully operational year. We also present the machine developments performed and the plans for future improvements. | ||
DOI • | reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOST007 | |
About • | Received ※ 09 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 04 July 2022 | |
Cite • | reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml) | |