Author: Schloesser, M.    [Schlösser, M.]
Paper Title Page
TUPOPT014 The Status of the SASE3 Variable Polarization Project at the European XFEL 1029
 
  • S. Karabekyan, S. Abeghyan, M. Bagha-Shanjani, S. Casalbuoni, U. Englisch, W. Freund, G. Geloni, J. Grünert, S. Hauf, C. Holz, D. La Civita, J. Laksman, D. Mamchyk, M.P. Planas, F. Preisskorn, S. Serkez, H. Sinn, M. Wuenschel, M. Yakopov, C. Youngman
    EuXFEL, Schenefeld, Germany
  • P. Altmann, A. Block, W. Decking, L. Fröhlich, O. Hensler, T. Ladwig, D. Lenz, D. Lipka, R. Mattusch, N. Mildner, E. Negodin, J. Prenting, F. Saretzki, M. Schlösser, F. Schmidt-Föhre, E. Schneidmiller, M. Scholz, D. Thoden, T. Wamsat, T. Wilksen, T. Wohlenberg, M.V. Yurkov
    DESY, Hamburg, Germany
  • J. Bahrdt
    HZB, Berlin, Germany
  • M. Brügger, M. Calvi, S. Danner, R. Ganter, L. Huber, A. Keller, C. Kittel, X. Liang, S. Reiche, M.S. Schmidt, T. Schmidt, K. Zhang
    PSI, Villigen PSI, Switzerland
  • D.E. Kim
    PAL, Pohang, Republic of Korea
  • Y. Li
    IHEP, People’s Republic of China
 
  The undulator systems at the European XFEL consist of two hard X-ray systems, SASE1 and SASE2, and one soft X-ray system, SASE3. All three systems are equipped with planar undulators using permanent neodymium magnets. These systems allow the generation of linearly polarized radiation in the horizontal plane. In order to generate variable polarization radiation in the soft X-ray range, an afterburner is currently being implemented behind the SASE3 planar undulator system. It consists of four APPLE-X helical undulators. The project, called SASE 3 Variable Polarization, is close to being put into operation. All four helical undulators have been installed in the tunnel during the 2021-2022 winter shutdown. This paper describes the status of the project and the steps toward its commissioning. It also presents lessons learned during the implementation of the project.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOPT014  
About • Received ※ 02 June 2022 — Revised ※ 12 June 2022 — Accepted ※ 13 June 2022 — Issue date ※ 05 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOMS015 Proposal of a Girder Realignment Test in PETRA III 1435
 
  • M. Schaumann, I.V. Agapov, R. Bartolini, M. Bieler, R. Böspflug, D. Einfeld, M.G. Hoffmann, J. Keil, L. Liao, G. Priebe, M. Schlösser, R. Wanzenberg
    DESY, Hamburg, Germany
 
  PETRA IV can benefit from the fine control of the girders that carry the storage ring elements to achieve the design beam performance. Based on the corrector magnet strength pattern it is desired to realign girders to stay within the alignment tolerances. In the current PETRA III configuration, the girders in the Max von Laue Hall are equipped for remote alignment, however, those have not been moved since their initial installation and the alignment system is currently not connected to the control system. In preparation for PETRA IV, a movement test of one of the PETRA III girders should confirm the ability to safely and precisely remote control the equipment based on an optics model that describes the effect of the girder movement on the orbit. This paper studies the feasibility of this test and prepares an initial mock-up experiment to be performed on a spare girder.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOMS015  
About • Received ※ 07 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 15 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)