WEPOTK023 Simulation Study of Fast Extraction in the Absence of One Septum Magnet for J-Parc Main Ring 2100
 
  • S. Iwata, S. Igarashi, K. Ishii, H. Matsumoto, N. Matsumoto, Y. Sato, T. Shibata, T. Sugimoto, T.Y. Yasui
    KEK, Tokai, Ibaraki, Japan
 
  At J-PARC main ring (MR), the two fast extracting beamlines to the neutrino facility and to the abort dump have a symmetrical layout of 6 septum magnets each, a total of 12. Since there are many magnets, it is necessary to be careful about failure. It is important to consider how to continue beam supply even if one of the septum mag-nets is missing. From July 2021, upgrade works of the FX septum magnets commenced with an aim of increasing the beam power of MR to 1.3 MW from 500 kW. We simulated the beam extraction without one of the septum magnets under the conditions of the new geometry of septum magnets and the new aperture. We found that the beam can be extracted by increasing the current of the surrounding septum magnets and compensating for the output.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK023  
About • Received ※ 08 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 25 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOTK024 Upgrade of Septum Magnets for Fast Extraction in J-Parc Main Ring 2103
 
  • S. Iwata, K. Ishii, H. Matsumoto, N. Matsumoto, Y. Sato, T. Shibata, T. Sugimoto, M. Uota
    KEK, Ibaraki, Japan
 
  We aim to supply a high-power proton beam of 1.3 MW to the neutrino facility from J-PARC Main Ring (MR) by shortening the repetition cycle to 1.16 s from 2.48 s and increasing the number of particles by 30%. The six sep-tum magnets for fast extraction (FX) need to be replaced to reduce the heat that is generated as a result of shorten-ing the repetition cycle. The replacement of the septum magnets began in July 2021 and was completed at the end of May 2022. The beam commissioning starts in June 2022. We report the details of the replacement work and operation test of the new septum magnets. We found a defect in the magnetic coil of the septum (SM32) in August 2021. We decided to postpone its installation to around August 2022 and produce new magnet coils for the SM32. The beam extraction in June 2022 will be per-formed using a temporary vacuum duct instead of the SM32 magnet, and the extraction beam orbit will be maintained by increasing the magnetic field of the other five septum magnets.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK024  
About • Received ※ 08 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 10 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)