Author: Kurdi, A.I.
Paper Title Page
WEOYSP3 Operation Experience with SESAME RF System 1636
 
  • D.S. Foudeh, A.I. Kurdi, N.Kh. Sawai
    SESAME, Allan, Jordan
 
  SESAME RF system has been in operation since 2017 where the operational electron beam current has been increased from 100mA to 300mA since then. The higher operational beam current together with the need to have longer beam lifetime to reduce number of injections per day required higher forward RF power, On the other hand; more attention needed to be paid to monitor and tackle the current driven High Order Modes and to respect the limitation on the forward RF power coming from the solid state amplifiers. In this paper we describe the RF system and report on the challenges we faced in addition to the operational experience we had with the RF system and solid state amplifiers.  
slides icon Slides WEOYSP3 [4.207 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEOYSP3  
About • Received ※ 03 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 07 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)