TUPOMS014 PETRA IV Storage Ring Design 1431
 
  • I.V. Agapov, S.A. Antipov, R. Bartolini, R. Brinkmann, Y.-C. Chae, D. Einfeld, T. Hellert, M. Hüning, M.A. Jebramcik, J. Keil, C. Li, R. Wanzenberg
    DESY, Hamburg, Germany
 
  PETRA IV will be a diffraction-limited 6 GeV synchrotron light source with an emittance of 20 pm rad at DESY Hamburg. The TDR phase is nearing completion, and the lattice design is being finalised. The lattice will be based on the six-bend achromat cell with extensive use of damping wigglers. The key challenges of the lattice design are finding the balance between emittance minimisation and non-linear beam dynamics performance, and adapting the lattice to a collider-type tunnel geometry of the PETRA facility, with the long straight sections and low degree of superperiodicity. We present the lattice design and the beam physics aspects, focusing on the beam dynamics performance and optimisation, and the projected beam parameters taking collective effects and lattice imperfections into account.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOMS014  
About • Received ※ 08 June 2022 — Revised ※ 14 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 26 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOMS029 Status of the PETRA IV Machine Project 1475
 
  • R. Bartolini, I.V. Agapov, A. Aloev, R. Bacher, R. Böspflug, H.-J. Eckoldt, J. Hauser, M. Hüning, P. Hülsmann, N. Koldrack, B. Krause, L. Lilje, G. Loisch, R. Onken, A. Petrov, S. Pfeiffer, J. Prenting, H. Schlarb, M. Thede, M. Tischer
    DESY, Hamburg, Germany
 
  DESY is planning the upgrade of PETRA III to a fourth generation light source, providing high brightness, quasi diffraction limited hard X-ray photons. The project is underpinned by the construction of a new storage ring PETRA IV, based on a 20 pm accelerator lattice using a hybrid 6-bend achromat concept. We review here the status of the machine project, the latest development in the different technical subsystems, the status of the engineering integration and the plans for the implementation of the new ring in the existing PETRA III tunnel.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOMS029  