Author: Gula, K.
Paper Title Page
TUPOPT024 Recent Developments at SOLARIS National Synchrotron Radiation Centre 1051
 
  • A.I. Wawrzyniak, P. Andryszczak, G. Cios, K. Gula, G.W. Kowalski, A.M. Marendziak, A. Maximenko, R. Panaś, T. Sobol, M. Szczepaniak, J.J. Wiechecki, M. Wiśniowski, M. Zając
    NSRC SOLARIS, Kraków, Poland
  • A. Curcio
    CLPU, Villamayor, Spain
  • H. Lichtenberg
    Hochschule Niederrhein University of Applied Sciences, Krefeld, Germany
 
  SOLARIS National Synchrotron Radiation Centre is under constant development of the research infrastructure. In 2018 first users were welcomed at three different experimental stations. Up to now 5 end stations are available at SOLARIS for experiments at 4 beamlines, and 4 new beamlines are under construction. In 2021 new front end for POLYX beamline was installed and de-gassed. Moreover, ASTRA beamline components were installed and first commissioning stage has stared. Additionally, a plasma cleaning station has been designed, built and is currently tested. Apart of the beamlines, up-grades to the linac and storage ring operation have been done. During the COVID-19 pandemic the software for remote injection process was developed and is used on daily basis. The transverse beam emittance measurement on the visible light beamline LUMOS was implemented and gives results that are complementary to the Pinhole beamline. Within this presentation the overview of the recent developments with insight to the details to be presented.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOPT024  
About • Received ※ 09 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 21 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
TUPOPT026 Design and Status of Fast Orbit Feedback System at SOLARIS 1059
 
  • G.W. Kowalski, K. Gula, R. Panaś, A.I. Wawrzyniak, J.J. Wiechecki
    NSRC SOLARIS, Kraków, Poland
 
  SOLARIS storage ring has been built with basic set of diagnostic and feedback systems. FOFB system, as much more advanced and not as critical for startup was envisioned as later addition to the design. Now, we are in the process of implementing this addition. The system’s workhorse is Instrumentation Technologies Libera Brilliance+ with its Fast Acquisition data path and customizable FPGA modules. Feedback algorithm running in hardware provides fast calculations and direct communication with fast power supplies. The hardware installation is almost finished with configuration and software works running in parallel. First measurements of response matrix and proof-of-concept tests were performed.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOPT026  
About • Received ※ 08 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 30 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)