Author: Gamba, D.
Paper Title Page
WEPOPT055 Linac3, LEIR and PS Performance with Ions in 2021 and Prospects for 2022 1983
 
  • N. Biancacci, S.C.P. Albright, R. Alemany-Fernández, D. Alves, M.E. Angoletta, D. Barrientos, H. Bartosik, G. Bellodi, S.B. Bertolo, D. Bodart, M. Bozzolan, H. Damerau, F.D.L. Di Lorenzo, A. Frassier, D. Gamba, A. Huschauer, S. Jensen, V. Kain, T. Koevener, G. Kotzian, D. Küchler, A. Lasheen, G. Le Godec, T.E. Levens, N. Madysa, E. Mahner, O. Marqversen, C.M. Mastrostefano, P.D. Meruga, C. Mutin, M. O’Neil, G. Piccinini, R. Scrivens, P.S. Solvang, D. Valuch, F.M. Velotti, R. Wegner, C. Wetton, M. Zampetakis
    CERN, Meyrin, Switzerland
 
  CERN accelerators underwent a period of long shutdown from the end of 2018 to 2020. During this time frame, significant hardware and software upgrades have been put in place to increase the performance of both proton and ion accelerator chains in the High Luminosity LHC era. In the context of the CERN lead ion chain, 2021 has been mainly devoted to restore the injectors’ performance and to successfully prove the slip-stacking technique in SPS. In this paper we summarise the key milestones of the ion beam commissioning and the achieved beam performance for the Linac 3 (including the source), LEIR and PS accelerators, together with an outlook on 2022 operation.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOPT055  
About • Received ※ 03 June 2022 — Revised ※ 12 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 17 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOTK026 Commissioning of the ELENA Electrostatic Transfer Lines for the Antimatter Facility at CERN 2110
 
  • Y. Dutheil, W. Bartmann, C. Carli, M.A. Fraser, D. Gamba, L. Ponce
    CERN, Meyrin, Switzerland
 
  ELENA is a small synchrotron ring that decelerates antiprotons down to a kinetic energy of 100 keV. With an experimental complex capable of housing up to 9 different experiments operating simultaneously, the transfer line design needed to be highly flexible. The low energy of the beam transported allowed the exploitation of electrostatic devices instead of magnets, to simplify design, production and operation. This contribution presents the systematic characterisation of the beam optics at the different experimental handover locations during beam commissioning using H ions from an external source, as well as the performance of the lines in operation with antiprotons. Finally, the effect of stray fields created by the experimental setup will be presented and compared with the first measurements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOTK026  
About • Received ※ 10 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 28 June 2022  
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
THOXGD1 ELENA - From Commissioning to Operation 2391
 
  • L. Ponce, L. Bojtár, C. Carli, B. Dupuy, Y. Dutheil, P. Freyermuth, D. Gamba, L.V. Jørgensen, B. Lefort, S. Pasinelli
    CERN, Meyrin, Switzerland
 
  In 2021 the Extra Low ENergy Antiproton ring (ELENA) moved from commissioning into the physics production phase providing 100 keV antiprotons to the newly connected experiments paving the way to an improved trapping efficiency by one to two orders of magnitude compared to the AD era. After recalling the major work undertaken during the CERN Long Shutdown 2 (2019-2020) in the antiproton deceleration complex, details will be given on the ELENA ring and the new electrostatic transfer line beam commissioning using an ion source. Sub-sequentially, the progress from commissioning with ions to operation with antiprotons will be described with emphasis on the achieved beam performance. Finally, the impact on the performance of the main hardware systems will be reviewed.  
slides icon Slides THOXGD1 [9.720 MB]  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-THOXGD1  
About • Received ※ 07 June 2022 — Revised ※ 15 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 01 July 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)