Author: Doebert, S.    [Döbert, S.]
Paper Title Page
WEPOST039 Mapping Charge Capture and Acceleration in a Plasma Wakefield of a Proton Bunch Using Variable Emittance Electron Beam Injection 1780
 
  • E. Granados, A.-M. Bachmann, E. Chevallay, S. Döbert, V.N. Fedosseev, F. Friebel, S.J. Gessner, E. Gschwendtner, S.Y. Kim, S. Mazzoni, M. Turner, L. Verra
    CERN, Meyrin, Switzerland
  • A.-M. Bachmann, L. Verra
    MPI, Muenchen, Germany
  • S.Y. Kim
    UNIST, Ulsan, Republic of Korea
  • S.Y. Kim
    ANL, Lemont, Illinois, USA
  • J.T. Moody
    MPI-P, München, Germany
 
  In the Phase 2 of the AWAKE first experimental run (from May to November 2018), an electron beam was used to probe and test proton-driven wakefield accelera-tion in a rubidium plasma column. The witness electron bunches were produced using an RF-gun equipped with a Cs2Te photocathode illuminated by a tailorable ultrafast ultraviolet (UV) laser pulse. The construction of the UV beam optical system enabled appropriate transverse beam shaping and control of its pulse duration, size, and position on the photocathode, as well as time delay with respect to the ionizing laser pulse that seeds the plasma wakefields in the proton bunches. Variable photocathode illumination provided the required flexibility to produce electron bunches with variable charge, emittance, and injection trajectory into the plasma column. In this work, we analyze the overall charge capture and shot-to-shot reproducibility of the proton-driven plasma wakefield accelerator with various UV illumination and electron bunch injection parameters.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOST039  
About • Received ※ 23 May 2022 — Revised ※ 10 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 29 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOPT062 Optimisation of the FCC-ee Positron Source Using a HTS Solenoid Matching Device 2003
 
  • Y. Zhao, S. Döbert, A. Latina, S. Ogur
    CERN, Meyrin, Switzerland
  • B. Auchmann, P. Craievich, J. Kosse, R. Zennaro
    PSI, Villigen PSI, Switzerland
  • I. Chaikovska, R. Chehab
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
  • M. Duda
    IFJ-PAN, Kraków, Poland
  • P.V. Martyshkin
    BINP SB RAS, Novosibirsk, Russia
 
  In this paper, we present the simulation and optimisation of the FCC-ee positron source, where a high-temperature superconducting (HTS) solenoid is used as the matching device to collect positrons from the target. The "conventional" target scheme is used which simply consists of amorphous tungsten. The target is placed inside the bore of the HTS solenoid to improve the accepted positron yield at the entrance of the damping ring and the location of the target is optimised. The latest recommended baseline beam parameters are used and presented. An optimisation of the ideal positron yield using the analytic SC solenoid on-axis field is also performed and shows that the design of the HTS solenoid is optimal as far as the accepted positron yield is concerned.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOPT062  
About • Received ※ 07 June 2022 — Revised ※ 14 June 2022 — Accepted ※ 14 June 2022 — Issue date ※ 16 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)  
 
WEPOPT063 The FCCee Pre-Injector Complex 2007
 
  • P. Craievich, B. Auchmann, S. Bettoni, H.-H. Braun, M. Duda, D. Hauenstein, E. Hohmann, R. Ischebeck, P.N. Juranič, J. Kosse, G.L. Orlandi, M. Pedrozzi, J.-Y. Raguin, S. Reiche, S.T. Sanfilippo, M. Schaer, N. Vallis, R. Zennaro
    PSI, Villigen PSI, Switzerland
  • F. Alharthi, I. Chaikovska, S. Ogur
    Université Paris-Saclay, CNRS/IN2P3, IJCLab, Orsay, France
  • W. Bartmann, M. Benedikt, M.I. Besana, M. Calviani, S. Döbert, Y. Dutheil, O. Etisken, J.L. Grenard, A. Grudiev, B. Humann, A. Latina, A. Lechner, K. Oide, A. Perillo-Marcone, H.W. Pommerenke, R.L. Ramjiawan, Y. Zhao, F. Zimmermann
    CERN, Meyrin, Switzerland
  • A. De Santis
    INFN/LNF, Frascati, Italy
  • Y. Enomoto, K. Furukawa, K. Oide
    KEK, Ibaraki, Japan
  • O. Etisken
    Kirikkale University, Kirikkale, Turkey
  • C. Milardi
    LNF-INFN, Frascati, Italy
  • T.O. Raubenheimer
    SLAC, Menlo Park, California, USA
  • N. Vallis
    EPFL, Lausanne, Switzerland
 
  The international FCC study group published in 2019 a Conceptual Design Report for an electron-positron collider with a centre-of-mass energy from 90 to 365 GeV with a beam currents of up to 1.4 A per beam. The high beam current of this collider create challenging requirements on the injection chain and all aspects of the linac need to be carefully reconsidered and revisited, including the injection time structure. The entire beam dynamics studies for the full linac, damping ring and transfer lines are major activities of the injector complex design. A key point is that any increase of positron production and capture efficiency reduces the cost and complexity of the driver linac, the heat and radiation load of the converter system, and increases the operational margin. In this paper we will give an overview of the status of the injector complex design and introduce the new layout that has been proposed by the study group working in the context of the CHART collaboration. In this framework, furthermore, we also present the preliminary studies of the FCC-ee positron source highlighting the main requirements and constraints.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-WEPOPT063  
About • Received ※ 11 June 2022 — Revised ※ 14 June 2022 — Accepted ※ 17 June 2022 — Issue date ※ 29 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)