Author: Cloué, C.
Paper Title Page
MOPOST011 CEA Contribution to the PIP-II Linear Accelerator 74
 
  • N. Bazin, J. Belorgey, S. Berry, J. Drant, O. Napoly, A. Raut, P. Sahuquet, C. Simon
    CEA-DRF-IRFU, France
  • S. Arsenyev, Q. Bertrand, P. Brédy, E. Cenni, C. Cloué, R. Cubizolles, H. Jenhani, S. Ladegaillerie, A. Le Baut, A. Moreau, O. Piquet
    CEA-IRFU, Gif-sur-Yvette, France
  • O. Napoly
    Fermilab, Batavia, Illinois, USA
 
  The Proton Improvement Plan II (PIP-II) that will be installed at Fermilab is the first U.S. accelerator project that will have significant contributions from international partners. CEA joined the international collaboration in 2018, and will deliver 10 low-beta cryomodules as In-Kind Contribution to the PIP-II project, with cavities supplied by LASA-INFN and power couplers and tuning systems supplied by Fermilab. This paper presents the CEA scope of work that includes the design, manufacturing, assembly and tests of the cryomodules and the upgrade of the existing infrastructures to the PIP-II requirements.  
DOI • reference for this paper ※ https://doi.org/10.18429/JACoW-IPAC2022-MOPOST011  
About • Received ※ 13 June 2022 — Revised ※ 13 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 25 June 2022
Cite • reference for this paper using ※ BibTeX, ※ LaTeX, ※ Text/Word, ※ RIS, ※ EndNote (xml)