Paper |
Title |
Page |
TUPOTK021 |
Recent Update on ESS Medium Beta Cavities at INFN LASA |
1245 |
|
- D. Sertore, M. Bertucci, M. Bonezzi, A. Bosotti, D. Cardelli, A. D’Ambros, A.T. Grimaldi, L. Monaco, R. Paparella, G.M. Zaggia
INFN/LASA, Segrate (MI), Italy
- C. Pagani
Università degli Studi di Milano & INFN, Segrate, Italy
|
|
|
The INFN LASA contribution to the European Spallation Source ERIC (European Research Infrastructure Consortium) Superconducting Linac is focused on supplying 36 cavities for the Medium Beta section of the proton accelerator. Twenty eight cavities have been fully qualified and delivered to CEA for integration into the cryomodules. We present the status of the activities dedicated to completing our contribution both by applying alternative surface treatments with respect to the series vertical BCP and by procuring new cavities.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOTK021
|
|
About • |
Received ※ 09 June 2022 — Accepted ※ 15 June 2022 — Issue date ※ 25 June 2022 |
|
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|
TUPOTK022 |
INFN-LASA for the Fermilab PIP-II |
1249 |
|
- R. Paparella, M. Bertucci, M. Bonezzi, A. Bosotti, D. Cardelli, A. D’Ambros, E. Del Core, A.T. Grimaldi, L. Monaco, D. Sertore, G.M. Zaggia
INFN/LASA, Segrate (MI), Italy
- C. Pagani
Università degli Studi di Milano & INFN, Segrate, Italy
|
|
|
The status of INFN-LASA contribution to the PIP-II project at Fermilab is reported in this paper. Experimental results and ongoing activities on prototypes are summarized together with the development of related testing infrastructures. The series production of the 38 5-cell, beta 0.61 cavities designed by INFN-LASA for the LB650 section of the PIP-II linac recently commenced, the status of major procurements and associated activities is here below presented. All cavities will be produced and surface treated in industry to reach the unprecedented performances required, qualified through vertical cold test at qualified infrastructures and delivered as linac-ready at the string assembly site.
|
|
DOI • |
reference for this paper
※ https://doi.org/10.18429/JACoW-IPAC2022-TUPOTK022
|
|
About • |
Received ※ 09 June 2022 — Revised ※ 10 June 2022 — Accepted ※ 16 June 2022 — Issue date ※ 04 July 2022 |
Cite • |
reference for this paper using
※ BibTeX,
※ LaTeX,
※ Text/Word,
※ RIS,
※ EndNote (xml)
|
|
|